Project note
Citia field work in 2026: a Q4 recap of 12 project notes in seven cities
As of Q4 2026, Citia has published 12 project notes dated 2026, seven finished and five ongoing, across seven cities in Jambi, Jawa Barat, Jawa Tengah and Banten.
- Quarterly recap
- Type
- Project note
- Published
- 13 November 2026
- Location
- Indonesia
- Reading time
- 4 min

This recap counts the project pages on the Citia website that carry the year 2026, as they stand in Q4 2026. The pages give the year and status of each job, not exact dates, so the recap covers the year to date rather than one quarter. Locations are given at city level, as on the pages.
Of the 12 notes, seven are marked finished and five ongoing. The ongoing ones are long-running or open jobs, such as the Padalarang TAS lifecycle support and the MOV communication restoration in Jambi.
- 12Project notes dated 2026Citia project pages
- 7FinishedStatus on each page
- 5OngoingStatus on each page
- 7CitiesIn four provinces
What the work was
- Terminal automation and lifecycle (4)
- Meter 5 and 6 integration and TAS work in Jambi; TAS lifecycle support and the B50 product update in Padalarang.
- Field communication (2)
- MOV communication restoration and ATG gateway replacement in Jambi.
- PLC and panel (2)
- PLC digital output and serial converter replacement in Karawang; panel and instrument termination in Cilacap.
- Instrumentation (2)
- Analyzer system integration in Garut; a pressure monitoring prototype in Indramayu.
- Safety (2)
- Filling shed grounding assessment in Indramayu; marine lantern repair in Cilegon.
The grouping above is Citia's own reading of each page's scope. Jambi stands out because one fuel terminal produced four notes: the integration of meters 5 and 6 into the CS Flow application, the TAS distribution workflow, the MOV restoration and the ATG gateway replacement. In Jawa Barat, work moved between Padalarang, Indramayu, Garut and Karawang.
Lessons that repeat
Test end to end
After replacing a gateway, test from the field device to the application before closing the job.
Protect communication lines early
RS-485 and LAN lines in lightning-prone areas need surge protection from the start.
Validate before you change
Check active material codes before a TAS product update, and run a test transaction after.
Check the whole loop
I/O condition, wiring, communication settings and network together find the cause faster.
Each lesson comes from a project page: the ATG gateway job in Jambi, the B50 update in Padalarang and the PLC output repair at a fuel terminal in Karawang. The Padalarang lifecycle page adds one more: complete documentation and root cause analysis keep the limits of each party's responsibility clear. The full list of jobs is on the Citia projects page.
Common questions
How many projects did Citia publish for 2026?
Twelve project notes carry the year 2026 as of 13 November 2026: seven finished and five ongoing.
Where did Citia work in 2026?
In Jambi, Padalarang, Indramayu, Garut, Karawang, Cilacap and Cilegon, across the provinces of Jambi, Jawa Barat, Jawa Tengah and Banten.
Does this recap cover only October to December?
No. The project pages record the year, not the exact date, so the recap covers all 2026 notes published as of Q4.
Sources and further reading
- Fuel Terminal Jambi distribution workflow (opens in a new tab)
- Pertamina Jambi Terminal: integration of meters 5 and 6 (opens in a new tab)
- Padalarang TAS lifecycle support (opens in a new tab)
- B50 product update, Padalarang fuel terminal (opens in a new tab)
- Jambi fuel terminal: replacement of ATG gateway (ECU) spare part (opens in a new tab)
- Supply of Allen-Bradley PLC digital output modules and Moxa converter (opens in a new tab)
- Cover photo by Yu Chu Chin, CC BY-SA 4.0 (cropped and colour graded) (opens in a new tab)
Next step
Discuss a similar need at your facility.
Tell us about the equipment and the process. The Citia team answers with technical context.
Related products and solutions
- KnowledgeTerminal Automation System (TAS): what it is, its components and how it worksA terminal automation system (TAS) runs fuel and LPG truck loading, from order and gate-in to metering, delivery documents and gate-out.
- KnowledgePLC troubleshooting: safe steps from symptom to fixMake the process safe, save the running program, then check power, CPU, I/O, wiring, communication and logic in that order. Symptom table and field cases.
- ProjectFuel Terminal Jambi distribution workflowTAS, device integration and LTSA support
- ProjectPadalarang TAS lifecycle supportDistribution TAS maintenance and troubleshooting
- ProjectBalongan filling shed: grounding system assessmentBalongan filling shed grounding module is dead and past its service life; servicing is recommended because static electricity can cause fire and explosion.
- ProjectPutranata: termination services at LOC-III, RU IV CilacapCitia, as subcontractor to PT Putranata Adi Mandiri, terminated panel and instrumentation cables at LOC III, Pertamina RU IV Cilacap, in about a month.
- ProjectPressmon prototype for BalonganThe PressMon prototype is a miniature of the Pressure Monitoring System concept for the Balongan-Plumpang pipeline.
- ProductINTEGRA TASRuns truck loading at fuel and LPG terminals, from order and gate-in to filling and gate-out documents.