2026Finished

Pertamina Jambi Terminal: integration of meters 5 and 6

PT. Citia Engineering Indonesia completed the Meter 5 and Meter 6 integration at the Pertamina Jambi Fuel Terminal. The work improved monitoring, communication and automation at the filling shed.

Year
2026
Location
Jambi
Status
Finished
Work types
TAS, Instrumentation, LTSA, Panel
Updated

PT. Citia Engineering Indonesia completed the Meter 5 and Meter 6 integration at the Pertamina Jambi Fuel Terminal. The work improved monitoring, communication and automation at the filling shed. Its aim was to bring flow meter data into the CS Flow application, so fuel dispatch can be monitored and controlled more effectively, accurately and in real time.

The system makes it easier for operators in the filling shed to load fuel into tank trucks. With meter data in CS Flow, operators can see dispatch parameters directly, work faster, make fewer recording errors, and run fuel distribution more reliably and efficiently.

The work began with installing a Meter User Interface (MUI) at each filling bay as the main interface between the operator and the flow meter system. The MUI shows loading process information, receives communication from the flow meter and passes the data to the control system, so operators can monitor and run fuel loading more easily, quickly and accurately.

Read the full record

The MUI was installed to the applicable installation standards and technical specifications to keep the system reliable. Next, an I/O module was added to the PLC to take the Pump Demand signal, so the pump operating signal is processed by the PLC and tied into the control system as the filling shed operation requires.

To support the field installation, a Junction Box (JB) panel was installed as the termination and distribution point for communication and power cables. The JB panel was placed according to the installation layout, which makes wiring, maintenance and later troubleshooting easier. The next step was integrating Meter 5 and Meter 6 with the CS Flow application.

This covered communication configuration, device parameter settings, data mapping (tag mapping) and communication tests, to confirm that all meter data is received, processed and shown correctly in CS Flow. Communication and power cables were then pulled from the JB panel to the MUI, flow meters, PLC and other supporting devices.

The work included laying cable routes, terminating at each device, checking cable continuity and verifying the installation, to confirm that power supply and data communication are stable and meet the installation standard. After installation was complete, the integrated system was commissioned.

Commissioning covered function tests of each device, verification of communication between the flow meter, MUI, PLC and CS Flow application, meter data reading tests, Pump Demand function tests, and a simulation of fuel loading at the filling bay, to confirm the whole system works to the design, technical specifications and operational needs.

As the final step, the work was handed over to the user after all tests showed that the system operates well and meets the technical requirements. With commissioning and handover done, the Meter 5 and Meter 6 integration at the Pertamina Jambi Fuel Terminal is ready for operation.

It supports smooth, fast, accurate and reliable fuel loading into tank trucks at every filling bay.