2026Finished

B50 product update, Padalarang fuel terminal

This document reports the reconfiguration and addition of the B50 product to replace the B40 product in the Terminal Automation System (TAS) at Pertamina Fuel Terminal Padalarang.

Year
2026
Status
Finished
Work types
Batch Controller
Updated

Overview > Implementation of the transition from Biosolar B40 to Biosolar B50. > Work location: Pertamina Fuel Terminal Padalarang. Effective from 1 July 2026. Active materials used: 1. Biofame A040900014 2. Biosolar B50 A040900219 The update focuses on the FD Flow application, to support B50 product transactions. Challenges The product code changes from the B40 scheme to B50. Risk of selecting the wrong product or recording the wrong transaction. The PSO/NPSO material codes are not used yet because they are still pending. The system must only handle the active materials that have been set. Solutions Reconfigured the products in the FD Flow application. Added or updated the material codes: 1. Biofame A040900014 2. Biosolar B50 A040900219 Ran test transactions with the new product codes. Documented the updated application screens and the test results. Lessons learned Active material codes must be validated before a system update. Pending materials must not be configured as operational products. Every product change needs a test run and documentation. System updates must follow the operational scheme in force at the terminal.

A similar need?

Tell us about your facility.

Name the equipment you run and what has to change. We reply with the questions we would ask on site.