2026Finished

Putranata: termination services at LOC-III, RU IV Cilacap

Putranata - Termination Services LOC III RU IV Cilacap. PT Citia Engineering acted as a subcontractor of PT Putranata Adi Mandiri on panel and instrumentation termination services at LOC III, Pertamina RU IV Cilacap Refinery.

Worker near a field panel with refinery units at night at Cilacap Refinery
Cilacap Refinery: Worker near a field panel with refinery units at night
Year
2026
Location
Cilacap, Jawa Tengah
Status
Finished
Work types
Instrumentation, Panel, PLC
Updated

Putranata - Termination Services LOC III RU IV Cilacap. PT Citia Engineering acted as a subcontractor of PT Putranata Adi Mandiri on panel and instrumentation termination services at LOC III, Pertamina RU IV Cilacap Refinery.

The project is part of the development of the control and safety system for the process facility, which supports the operational reliability of the refinery. Citia Engineering's scope focused on terminating instrumentation and control cables in several panels and junction boxes (JB).

All work followed the engineering documents, such as wiring diagrams, cable schedules, terminal schedules and loop drawings, so each connection met the technical specifications and quality standards. On this project, PT Citia Engineering worked on four main panels: two Unit Control Panels (UCP) and two Local Control Panels (LCP).

Read the full record

The panels use the AADvance™ Safety Controller made by Rockwell Automation as the control system for process safety applications. Each termination was therefore done with great care, so that all control and instrumentation signals work properly.

Besides the panels, PT Citia Engineering also terminated several junction boxes (JB), including the ROV (Remote Operated Valve) JB and other instrumentation junction boxes spread across the project area.

The work included cable identification, cable gland installation, ferrule and cable marker installation, cable dressing, termination on terminal blocks, and terminal tightness checks to the instrumentation installation standard.

To ensure quality, each termination stage included inspection and verification: checking the wiring against the working drawings, cable continuity tests, point-to-point verification, and a final check before the panel was declared ready for testing and commissioning. This confirmed that every connection was installed correctly, neatly and to the system design.

During the project, PT Citia Engineering applied the Health, Safety, Security, and Environment (HSSE) standards in force at Pertamina RU IV Cilacap Refinery.

All personnel worked to the safety procedures, from toolbox meetings and use of personal protective equipment (PPE) to compliance with the permit to work system, so the work was done safely without loss of quality or productivity.

The termination services were completed in about one month, through good coordination between Pertamina RU IV Cilacap as project owner, PT Putranata Adi Mandiri as main contractor, and PT Citia Engineering as subcontractor. With a focus on quality, accuracy and professionalism, PT Citia Engineering finished the full scope on target.

The project adds to PT Citia Engineering's experience in instrumentation installation, control panel termination and industrial automation systems, especially in oil and gas facilities that demand high reliability, accuracy and work safety.

From site

Field photos.

  • Metal control panel in a refinery area at Cilacap Refinery
    Cilacap Refinery: Metal control panel in a refinery area
  • I/O modules and cables in a cabinet at Cilacap Refinery
    Cilacap Refinery: I/O modules and cables in a cabinet
  • Worker wiring inside a cabinet at Cilacap Refinery
    Cilacap Refinery: Worker wiring inside a cabinet

A similar need?

Tell us about your facility.

Name the equipment you run and what has to change. We reply with the questions we would ask on site.