Project history 2020 to 2026

201 projects since 2020.

This is the full list: what we built, repaired or maintained, where, and whether the work is still running. Projects with a page open into the story behind them.

Projects on record
201
Years of work, 2020 to 2026
7
Still running
8
Cities with recorded work
27
Jetty walkway with pipes and yellow rails extending over the sea at Donggala Terminal
Donggala Terminal: Jetty walkway with pipes and yellow rails extending over the sea

Every record

Project history.

Filter by year, status or keyword. 52 records have a page of their own.

Showing 193 to 201 of 201 records

  1. 2020USG module reconditioningFinished
  2. -Cirebon Power: annual AQMS maintenanceCirebon, Jawa BaratFinishedProject page available
  3. -Cirebon Power: annual AQMS maintenanceCirebon, Jawa BaratFinished
  4. -Megger DPM reconditioningFinished
  5. -PAGA module reconditioningBandung, Jawa BaratFinishedProject page available
  6. -Panel meter productionFinished
  7. -PJA plantFinished
  8. -SA plantFinished
  9. -Yokogawa DPM reconditioningFinished

Rows with this icon open a project page.

Where Citia has worked

From Lhokseumawe to Bitung.

30 sites in 17 provinces from Citia's project records and website archive. The years of work at each site are in the list below the map.

2020 to 202630 / 30 sites

The next point could be your facility.

Our engineering team is based in Jakarta (WIB) and has worked at sites in the WIB and WITA time zones. Tell us the location and the equipment you have.

Map of Indonesia with 30 Citia work sites, lines from the Jakarta office and the WIB, WITA and WIT time zones. The full list is below the map.Map of Indonesia with 30 Citia work sites, lines from the Jakarta office and the WIB, WITA and WIT time zones. The full list is below the map.

Work site OfficeWIB · WITA · WIT

List of 30 sites
  • Cikampek fuel terminalJawa BaratTAS and TMS upgrades, SAP migration, pump control, LTSA2020, 2021, 2022, 2024, 2025, 2026
  • Pulau Layang terminal, PalembangSumatera SelatanLPG TAS, ATG and control valve integration, avtur metering, weighing2020, 2021, 2022, 2024, 2025
  • Cilacap: RU IV refinery and Lomanis terminalJawa TengahLOC-III panel termination, utility control panel, ABB DCS and troubleshooting2020, 2021, 2024, 2026
  • Paiton, ProbolinggoJawa TimurUPS reconditioning2020
  • Saguling, West BandungJawa BaratPDM reconditioning2020
  • Data centres, Greater JakartaJabodetabekData centre system supervision, wiring and termination, gensets2020, 2021, 2022, 2024
  • CianjurJawa BaratTurbine material and chiller SCADA2020, 2021
  • BanyuwangiJawa TimurPlant control programming2020
  • Lawang, MalangJawa TimurPositioner repair2020
  • Balongan, IndramayuJawa BaratRefinery EWTP control, PressMon, pump sequencing, grounding assessment2021, 2023, 2024, 2025, 2026
  • Panjang LPG terminal, LampungLampungLPG TAS LTSA and normalisation2021, 2022
  • Jambi fuel terminalJambiMeter integration, TAS and ATG, LTSA support2022, 2024, 2025, 2026
  • Padalarang fuel terminalJawa BaratTAS LTSA, B35 and B50 product updates2022, 2023, 2024, 2025, 2026
  • Tuhup jetty, Murung RayaKalimantan TengahRiver water-level monitoring2022
  • Pulau Baai fuel terminal, BengkuluBengkuluATG LTSA, pump ESD, smart seal, TMS server2023, 2024, 2025, 2026
  • Bitung terminalSulawesi UtaraPump PLC normalisation, VSD assessment2023, 2025
  • LhokseumaweAcehTerminal Automation System2023
  • CirebonJawa BaratAQMS and annual maintenance2023
  • Tanjung Priok and Plumpang, JakartaDKI JakartaUnloading and backloading normalisation, LPG transmitters, alarms, PressMon2024, 2025
  • Lubuk LinggauSumatera SelatanTank level alarm2024
  • Manggis integrated terminal, BaliBaliPressure transmitter monitoring2024
  • RSUD Al Ihsan, Bandung RegencyJawa BaratFire alarm system2024
  • Donggala fuel terminalSulawesi TengahTAS assessment, PLC panel UPS2025
  • Tarakan fuel terminalKalimantan UtaraMeter integration, in progress2026
  • Kamojang, GarutJawa BaratCasing reconstruction and added control valve, in progress2026
  • Tanjung, TabalongKalimantan SelatanTruck scaling system, in progress2026
  • CilegonBantenPort crane power monitoringwebsite archive
  • GresikJawa Timur6 kV and 20 kV switchgear monitoringwebsite archive
  • Labuhan Maringgai, East LampungLampungGas pipeline station control systemwebsite archive
  • Balikpapan refineryKalimantan TimurRDMP sludge bagging control panelwebsite archive

Project customers in Citia's work records

35 references, each with the scope and Citia's role
  • Pertamina Patra Niaga
  • Kimia Farma
  • Bio Farma
  • Adaro / Maritim Barito Perkasa
  • Cirebon Power
  • Redeco Petrolin Utama
  • Rich Products
  • ABB Sakti Industri
  • Indosat
  • Petrokimia Gresik
  • Pelindo
  • Tirta Fresindo Jaya / Mayora
  • PJB, Awar-Awar & Paiton facilities
  • Indonesia Power, Saguling
  • Granitor
  • Chandra Asri
  • Molindo Industri
  • Radiant Utama
  • Petro Jordan Abadi
  • Krakatau Bandar Samudra
  • Fajar Paper
  • Pertamina refinery facilities
  • Pertamina Geothermal Energi, Kamojang
  • Tanjung Power

Collaboration partnersMPSPutranataSarana InstrumentPertamina Patra Logistik