2023Finished

MPS: Hasakona

This project covers the design and automation of the Sludge Bagging System (SBS) at the Pertamina Balikpapan refinery.

Control panel with modules and cables at Hasakona
Hasakona: Control panel with modules and cables
Year
2023
Location
Balikpapan, Kalimantan Timur
Status
Finished
Work types
HMI, Panel, PLC, SCADA
Updated

Challenges

  • Packing accuracy: Make sure the pusher and packing system consistently cut off the sludge flow to reach a precise weight of 1 ton, given the difficult viscosity of the sludge.

  • Continuous reliability (high availability): Prevent downtime in the residual sludge handling system. A failure could cause sludge to pile up and disturb the main refinery process.

  • Material flow coordination: Control and balance the sludge flow automatically from the conveyor to the main and secondary hopper without overflow.

Solutions

  • Redundant control system: Implemented a PLC Modicon M580 Redundant System control architecture from Schneider Electric. It leaves no single point of failure in controlling the conveyor, hopper and packing actuators, so operation continues without interruption.

  • Central monitoring: Used EcoStruxure SCADA Expert (Schneider Electric) to give operators full visibility. The status of both hoppers, the conveyor speed and the 1 ton load reading (scale) are monitored in real time to keep the process within its parameters.

Lessons learned

  • A redundant control architecture at PLC level is critical for supporting utilities (such as waste and sludge handling) in an oil and gas refinery, to maintain zero downtime.

  • A responsive link between the weight sensor in the packing system, the PLC and the SCADA is the key to handling the variation in the sludge and reaching the 1 ton packing target consistently.

A similar need?

Tell us about your facility.

Name the equipment you run and what has to change. We reply with the questions we would ask on site.