Project history 2020 to 2026
201 projects since 2020.
This is the full list: what we built, repaired or maintained, where, and whether the work is still running. Projects with a page open into the story behind them.
- Projects on record
- 201
- Years of work, 2020 to 2026
- 7
- Still running
- 8
- Cities with recorded work
- 25

A new selection each visit
Work we can show you.
Each project here has a written story and photos from site.
Adaro: water level monitoring systemThe River Water Level Monitoring project, using the VEGAPULS C30 radar sensor, was carried out to provide real-time, accurate and reliable monitoring of river water level.Read the project
Putranata: terminations in three turnaround areas, RU IV CilacapA control panel revitalization and replacement project at the Pertamina Cilacap Refinery, covering three operating areas: KPC, RFCC, and IGB.Read the project
Supply of Allen-Bradley PLC digital output modules and Moxa converterThe work was done at the Cikampek fuel terminal. It covers troubleshooting and replacement of the faulty Digital Output (DO) on the Allen-Bradley PLC, including checks of I/O function and related wiring.Read the project
Every record
Project history.
Filter by year, status or keyword. 52 records have a page of their own.
Showing 1 to 16 of 23 records · Reset filters
- 2021ABB IKDC phase 3Bogor, Jawa BaratFinishedProject page available
- 2021ABB: continued supervision of Amazon 62 and 60 (month 2)Finished
- 2021ABB IKDC phase 3Finished
- 2021ABB Keppel: supervision and wiringFinished
- 2021ABB: supervision of Amazon 61Finished
- 2021Aquafine ballast 43474-1Finished
- 2021AVEVA InTouch HMI 2020 workstation, 1K tags with I/O (InTch-04-N-20)Finished
- 2021Donaldson P-SRF 10/30 sterile vent filter for the water system team, Banjaran plantFinished
- 2021LPG Pangkalan SusuFinished
- 2021Overtime: AmazonFinished
- 2021Overtime: Amazon 60 and 62Finished
- 2021Overtime: KeppelFinished
- 2021Pertamina Cikampek: LTSA 2021, period 1Finished
- 2021Pertamina Cikampek: LTSA for the fuel terminal TASFinished
- 2021Pertamina Cikampek: TAS upgrade for the filling shedFinished
- 2021Pertamina Lomanis fuel terminal: troubleshootingFinished
Rows with this icon open a project page.
Where Citia has worked
From Lhokseumawe to Bitung.
30 sites in 17 provinces from Citia's project records and website archive. The years of work at each site are in the list below the map.
The next point could be your facility.
Our engineering team is based in Jakarta (WIB) and has worked at sites in the WIB and WITA time zones. Tell us the location and the equipment you have.
Work site OfficeWIB · WITA · WIT
List of 30 sites
- Cikampek fuel terminalJawa BaratTAS and TMS upgrades, SAP migration, pump control, LTSA2020, 2021, 2022, 2024, 2025, 2026
- Pulau Layang terminal, PalembangSumatera SelatanLPG TAS, ATG and control valve integration, avtur metering, weighing2020, 2021, 2022, 2024, 2025
- Cilacap: RU IV refinery and Lomanis terminalJawa TengahLOC-III panel termination, utility control panel, ABB DCS and troubleshooting2020, 2021, 2024, 2026
- Paiton, ProbolinggoJawa TimurUPS reconditioning2020
- Saguling, West BandungJawa BaratPDM reconditioning2020
- Data centres, Greater JakartaJabodetabekData centre system supervision, wiring and termination, gensets2020, 2021, 2022, 2024
- CianjurJawa BaratTurbine material and chiller SCADA2020, 2021
- BanyuwangiJawa TimurPlant control programming2020
- Lawang, MalangJawa TimurPositioner repair2020
- Balongan, IndramayuJawa BaratRefinery EWTP control, PressMon, pump sequencing, grounding assessment2021, 2023, 2024, 2025, 2026
- Panjang LPG terminal, LampungLampungLPG TAS LTSA and normalisation2021, 2022
- Jambi fuel terminalJambiMeter integration, TAS and ATG, LTSA support2022, 2024, 2025, 2026
- Padalarang fuel terminalJawa BaratTAS LTSA, B35 and B50 product updates2022, 2023, 2024, 2025, 2026
- Tuhup jetty, Murung RayaKalimantan TengahRiver water-level monitoring2022
- Pulau Baai fuel terminal, BengkuluBengkuluATG LTSA, pump ESD, smart seal, TMS server2023, 2024, 2025, 2026
- Bitung terminalSulawesi UtaraPump PLC normalisation, VSD assessment2023, 2025
- LhokseumaweAcehTerminal Automation System2023
- CirebonJawa BaratAQMS and annual maintenance2023
- Tanjung Priok and Plumpang, JakartaDKI JakartaUnloading and backloading normalisation, LPG transmitters, alarms, PressMon2024, 2025
- Lubuk LinggauSumatera SelatanTank level alarm2024
- Manggis integrated terminal, BaliBaliPressure transmitter monitoring2024
- RSUD Al Ihsan, Bandung RegencyJawa BaratFire alarm system2024
- Donggala fuel terminalSulawesi TengahTAS assessment, PLC panel UPS2025
- Tarakan fuel terminalKalimantan UtaraMeter integration, in progress2026
- Kamojang, GarutJawa BaratCasing reconstruction and added control valve, in progress2026
- Tanjung, TabalongKalimantan SelatanTruck scaling system, in progress2026
- CilegonBantenPort crane power monitoringwebsite archive
- GresikJawa Timur6 kV and 20 kV switchgear monitoringwebsite archive
- Labuhan Maringgai, East LampungLampungGas pipeline station control systemwebsite archive
- Balikpapan refineryKalimantan TimurRDMP sludge bagging control panelwebsite archive
Project customers in Citia's work records
35 references, each with the scope and Citia's roleCollaboration partnersMPSPutranataSarana InstrumentPertamina Patra Logistik
Your facility could be the next record.
Describe the equipment you run and what has to change. We reply with the questions we would ask on site.




















