2021Finished
ABB IKDC phase 3
The ABB IKDC Phase 3 project supported the installation, integration and testing of electrical and automation systems.

- Year
- 2021
- Location
- Bogor, Jawa Barat
- Status
- Finished
- Work types
- Panel, Other
- Updated
Overview
The ABB IKDC Phase 3 project supports the installation, integration and commissioning of electrical and automation systems, so that all equipment operates safely, reliably and to the technical specification. The scope of work covers panel installation, cable termination, device configuration, function testing, troubleshooting and system verification before handover to the user.
Challenges
Integrating the new system with the existing infrastructure and equipment.
Finishing the work on the project schedule without lowering installation quality.
Confirming that all communication, control and protection functions work before commissioning.
Keeping to work safety standards throughout the project.
Solutions
Inspected the installation, verified the wiring and checked the configuration before testing.
Ran continuity tests, I/O tests and functional tests to confirm the whole system works as designed.
Troubleshot and adjusted the configuration until all system functions ran normally.
Applied HSSE procedures consistently and coordinated with the whole project team during the work.
Lessons learned
Verifying the installation and configuration early reduces troubleshooting time during commissioning.
Good coordination between teams makes the project run more efficiently and finish sooner.
Documenting test results and system configuration is essential to support operation and maintenance.
Thorough testing before handover improves system reliability and confirms that all functions meet operational needs.