201 projects since 2020.
This is the full list: what we built, repaired or maintained, where, and whether the work is still running. Projects with a page open into the story behind them.
- Projects on record
- 201
- Years of work, 2020 to 2026
- 7
- Still running
- 8
- Cities with recorded work
- 27

A new selection each visit
Work we can show you.
Each project here has a written story and photos from site.
Putranata: terminations in three turnaround areas, RU IV CilacapA control panel revitalization and replacement project at the Pertamina Cilacap Refinery, covering three operating areas: KPC, RFCC, and IGB.Read the project
Pertamina ITJ LPG Priok: transmitter replacement in areas PMB III and IVA transmitter converts a physical quantity measured by a sensor into a standard signal that can be sent to a control system such as a PLC, DCS, SCADA, or indicator.Read the project
ABB KeppelThe ABB Keppel project supported the installation, integration and testing of electrical and automation systems at an industrial facility.Read the project
Every record
Project history.
Filter by year, status or keyword. 52 records have a page of their own.
Showing 17 to 32 of 35 records · Reset filters
- 2020CP: PM10 reconditioningFinished
- 2020Flow meter installationFinished
- 2020Fluke 725 reconditioningFinished
- 2020Fuji PLC updateFinished
- 2020IG programming, GlenmoreFinished
- 2020IP Saguling: PDM reconditioningPurwakarta, Jawa BaratFinishedProject page available
- 2020Lomanis fuel terminal: computer reconditioningFinished
- 2020Molindo: positioner repairFinished
- 2020OPC programming, SuramaduFinished
- 2020Pelindo: Fuji update, phase 2Finished
- 2020Pelindo: Siemens program updateFinished
- 2020Pertamina Pulau Layang: TAS migrationFinished
- 2020Petrokimia Gresik: ABB PLC repairFinishedProject page available
- 2020Saimo module reconditioningFinished
- 2020Santi: installationFinished
- 2020SCADA chiller troubleshooting at MayoraCianjur, Jawa BaratFinishedProject page available
Rows with this icon open a project page.
Where Citia has worked
From Lhokseumawe to Bitung.
30 sites in 17 provinces from Citia's project records and website archive. The years of work at each site are in the list below the map.
The next point could be your facility.
Our engineering team is based in Jakarta (WIB) and has worked at sites in the WIB and WITA time zones. Tell us the location and the equipment you have.
Work site OfficeWIB · WITA · WIT
List of 30 sites
- Cikampek fuel terminalJawa BaratTAS and TMS upgrades, SAP migration, pump control, LTSA2020, 2021, 2022, 2024, 2025, 2026
- Pulau Layang terminal, PalembangSumatera SelatanLPG TAS, ATG and control valve integration, avtur metering, weighing2020, 2021, 2022, 2024, 2025
- Cilacap: RU IV refinery and Lomanis terminalJawa TengahLOC-III panel termination, utility control panel, ABB DCS and troubleshooting2020, 2021, 2024, 2026
- Paiton, ProbolinggoJawa TimurUPS reconditioning2020
- Saguling, West BandungJawa BaratPDM reconditioning2020
- Data centres, Greater JakartaJabodetabekData centre system supervision, wiring and termination, gensets2020, 2021, 2022, 2024
- CianjurJawa BaratTurbine material and chiller SCADA2020, 2021
- BanyuwangiJawa TimurPlant control programming2020
- Lawang, MalangJawa TimurPositioner repair2020
- Balongan, IndramayuJawa BaratRefinery EWTP control, PressMon, pump sequencing, grounding assessment2021, 2023, 2024, 2025, 2026
- Panjang LPG terminal, LampungLampungLPG TAS LTSA and normalisation2021, 2022
- Jambi fuel terminalJambiMeter integration, TAS and ATG, LTSA support2022, 2024, 2025, 2026
- Padalarang fuel terminalJawa BaratTAS LTSA, B35 and B50 product updates2022, 2023, 2024, 2025, 2026
- Tuhup jetty, Murung RayaKalimantan TengahRiver water-level monitoring2022
- Pulau Baai fuel terminal, BengkuluBengkuluATG LTSA, pump ESD, smart seal, TMS server2023, 2024, 2025, 2026
- Bitung terminalSulawesi UtaraPump PLC normalisation, VSD assessment2023, 2025
- LhokseumaweAcehTerminal Automation System2023
- CirebonJawa BaratAQMS and annual maintenance2023
- Tanjung Priok and Plumpang, JakartaDKI JakartaUnloading and backloading normalisation, LPG transmitters, alarms, PressMon2024, 2025
- Lubuk LinggauSumatera SelatanTank level alarm2024
- Manggis integrated terminal, BaliBaliPressure transmitter monitoring2024
- RSUD Al Ihsan, Bandung RegencyJawa BaratFire alarm system2024
- Donggala fuel terminalSulawesi TengahTAS assessment, PLC panel UPS2025
- Tarakan fuel terminalKalimantan UtaraMeter integration, in progress2026
- Kamojang, GarutJawa BaratCasing reconstruction and added control valve, in progress2026
- Tanjung, TabalongKalimantan SelatanTruck scaling system, in progress2026
- CilegonBantenPort crane power monitoringwebsite archive
- GresikJawa Timur6 kV and 20 kV switchgear monitoringwebsite archive
- Labuhan Maringgai, East LampungLampungGas pipeline station control systemwebsite archive
- Balikpapan refineryKalimantan TimurRDMP sludge bagging control panelwebsite archive
Project customers in Citia's work records
35 references, each with the scope and Citia's roleCollaboration partnersMPSPutranataSarana InstrumentPertamina Patra Logistik
Your facility could be the next record.