Knowledge
PLC/SCADA assessment: start with symptoms, topology and backups
Separate equipment, communications, applications and operating processes before deciding on replacement.
Read the postEngineering guides, technical bulletins, webinar sessions and project notes from the Citia team. Newest first.
Knowledge
Separate equipment, communications, applications and operating processes before deciding on replacement.
Read the postCovers RTU and SCADA integration for LPG and fuel unloading at island berths, including instrument monitoring, maintenance and calibration.
Covers Marine Loading Arm automation with SCADA monitoring, automatic control and Emergency Shutdown integration during unloading.
Covers water level sensors, critical-threshold alarms and web dashboards connected to SCADA for jetty and vessel berthing operations.
Covers API-based integration for communication between existing fuel terminal systems and monitoring platforms.
Covers fuel transfer monitoring, overfill detection and automated emergency response through PLC and SCADA integration.
Covers Early Warning Systems at fuel terminals, including hazard detection, ex-proof sensors and monitoring integration.
Covers pump monitoring, automatic control and PLC-based pump running-hours management at fuel distribution terminals.
Covers booster pump Emergency Shutdown on fuel transmission pipelines, including high-pressure response and monitoring integration.
Webinar
CITIA Micro-Webinar #01 covers TAS reliability and troubleshooting from HMI to field devices with Muhammad Mashfukh, on 23 October 2026 at 14.00 WIB.