Updated

Pulau Layang TAS support covers preventive and corrective maintenance of applications and equipment supporting receiving, storage and distribution. The scope connects SCADA, control and communication checks to terminal operating needs and work documentation.

Overview

The LTSA for the TAS at Pulau Layang is a maintenance service for the facilities and infrastructure of the Terminal Automation System (TAS) on Pulau Layang. The scope covers:

  • Distribution, receipt and storage software

  • SCADA system

  • Electrical system

  • Safety system, including Motor Operated Valves (MOV) and Emergency Shut Down Valves (ESDV)

Challenges

  • Coordination and permit processing with the Kertapati office, which is far from Pulau Layang.

  • Hardware testing had to fit the terminal operating schedule, especially receipt and dispatch activities.

  • Invoicing administration took a long time and needed regular follow-up with PT Vivi Rizki.

Solutions

  • Handled administration and permits before office hours in Kertapati to speed up the work.

  • Coordinated closely with the operations team to choose test times that do not disturb receipt or dispatch.

  • Monitored and followed up invoicing regularly with PT Vivi Rizki until the administration was complete.

Lessons learned

  • Coordination from the early stage reduces delays in permits and in carrying out the work.

  • Flexible scheduling is essential so maintenance does not disturb terminal operations.

  • Monitoring the administration and keeping communication consistent with all parties speeds up invoicing.

  • Good collaboration between the maintenance team, operations and third parties is a key factor in delivering the LTSA for the TAS at Pulau Layang.

A similar need?