# HPM: Rolls Royce, Genset Data Center JKT02 & JKT05

Generator Installation, QA/QC Inspection, Testing & Commissioning Documentation Dokumen ini merupakan kumpulan dokumentasi teknis yang disusun sebagai bagian dari pelaksanaan JKT02 Project dan JKT05 Project , yang mencakup…

| Info | Isi |
| --- | --- |
| Tahun | 2024 |
| Lokasi | Jakarta, Jawa Barat |
| Status | Selesai |
| Jenis pekerjaan | Panel, Lainnya |
| Diperbarui | 2026-08-04 |

![Deretan unit genset dan tangga baja di Pusat data Jakarta](https://citia-engineering.com/media/field/datacenter-genset-bank-01-1024.webp)

## Tentang pekerjaan ini

Generator installation, QA/QC inspection, testing and commissioning documentation. This document is a set of technical records prepared for the JKT02 Project and the JKT05 Project.

It covers every stage of work: installation, Quality Assurance and Quality Control (QA/QC), pre-commissioning, testing, commissioning and operational readiness for the generator system and all its supporting equipment. The purpose of the document is to give a complete, documented record of all verification, inspection, testing and validation of the system.

This confirms that each installed item meets the design requirements, technical specifications, safety standards, project quality standards and manufacturer recommendations before it is handed over for operation.

The scope includes inspection of the mechanical, electrical, instrumentation and control system installation, installation quality checks (QA/QC Inspection), foundation dimension verification (Plinth Dimension Inspection), a system readiness check before operation (Vendor Pre Start-Up Inspection), the Initial Start-Up, and a series of tests and commissioning of all main and supporting generator systems.

Testing followed the procedures and test scripts prepared to make sure each system works according to the design philosophy and the operational needs of the facility.

The tests include the Generator Load Test, Fuel Polishing System Test, Fuel System Test, Fuel Heater Panel Functional Test, Generator Alarm System Test, and the Water Mist Panel and Fire Protection System Functional Test.

Each stage used functional inspection, simulation of normal and abnormal operating conditions, verification of alarms and interlocks, testing of protection devices, recording of operating parameters, and evaluation of results against the defined Acceptance Criteria.

All results are documented as inspection reports, verification checklists, measurement data, test results, visual documentation, and completion records where nonconformities were found during the work. This documentation is the evidence that all systems went through full verification and validation to the project quality standard.

The document is part of the Project Completion Documentation and the Commissioning Dossier. It is the basis for Performance Verification, the Site Acceptance Test (SAT), Project Handover and the readiness of the facility to enter operation.

Besides serving as the project handover document, it is a technical reference for operation, maintenance, periodic inspection and performance evaluation of the system during the operating life of the facility on site.

## Foto lapangan

- Pusat data Jakarta: Unit genset dan crane di lokasi pusat data
- Pusat data Jakarta: Tangan bersarung memasang kabel pembumian pada busbar
- Pusat data Jakarta: Teknisi di depan kabinet kontrol terbuka

## Kontak

- Perusahaan: PT Citia Engineering Indonesia
- Email: services@citiaengineering.com
- Telepon: +62 21 278 20286
- Kantor: Jl. Kaimun Jaya No. 1, Cilandak Barat, Jakarta Selatan, DKI Jakarta 12430, Indonesia

[Hubungi Citia](https://citia-engineering.com/id/contact.md)

## Data terstruktur (JSON-LD)

```json
{
  "@context": "https://schema.org",
  "@graph": [
    {
      "@type": "Organization",
      "@id": "https://citia-engineering.com/#organization",
      "name": "Citia Engineering Indonesia",
      "legalName": "PT Citia Engineering Indonesia",
      "alternateName": "Citia",
      "url": "https://citia-engineering.com",
      "logo": {
        "@type": "ImageObject",
        "url": "https://citia-engineering.com/media/citia-logo.png",
        "width": 950,
        "height": 328
      },
      "description": "Citia adalah perusahaan engineering dan integrasi sistem di Jakarta. Kami menghubungkan perangkat lapangan, PLC dan SCADA, software terminal dan sistem enterprise, lalu memasang, menguji dan merawatnya.",
      "email": "services@citiaengineering.com",
      "telephone": "+62 21 278 20286",
      "address": {
        "@type": "PostalAddress",
        "streetAddress": "Jl. Kaimun Jaya No. 1, Cilandak Barat",
        "addressLocality": "Jakarta Selatan",
        "addressRegion": "DKI Jakarta",
        "postalCode": "12430",
        "addressCountry": "ID"
      },
      "contactPoint": {
        "@type": "ContactPoint",
        "contactType": "customer service",
        "email": "services@citiaengineering.com",
        "telephone": "+62 21 278 20286",
        "url": "https://citia-engineering.com/id/contact"
      },
      "areaServed": {
        "@type": "Country",
        "name": "Indonesia"
      },
      "knowsAbout": [
        "Otomasi & operasi terminal",
        "Tank farm & inventory",
        "Sistem kontrol & instrumentasi",
        "Reliability & lifecycle",
        "Industrial IoT & pemantauan",
        "Instalasi & site engineering",
        "INTEGRA: Software yang menjalankan operasi terminal",
        "CATALYST: Perangkat dan gateway yang mengumpulkan data lapangan",
        "Services: Engineering yang merancang, memasang, mengintegrasikan dan merawat keduanya"
      ]
    },
    {
      "@type": "WebSite",
      "@id": "https://citia-engineering.com/#website",
      "url": "https://citia-engineering.com",
      "name": "Citia Engineering Indonesia",
      "inLanguage": [
        "en",
        "id"
      ],
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "potentialAction": [
        {
          "@type": "SearchAction",
          "name": "Search Citia News",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/en/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        },
        {
          "@type": "SearchAction",
          "name": "Cari di News Citia",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/id/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        }
      ]
    },
    {
      "@type": "WebPage",
      "@id": "https://citia-engineering.com/id/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05#webpage",
      "url": "https://citia-engineering.com/id/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05",
      "name": "HPM: Rolls Royce, Genset Data Center JKT02 & JKT05",
      "description": "Generator Installation, QA/QC Inspection, Testing & Commissioning Documentation Dokumen ini merupakan kumpulan dokumentasi teknis yang disusun sebagai bagian…",
      "inLanguage": "id",
      "isPartOf": {
        "@id": "https://citia-engineering.com/#website"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "about": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "breadcrumb": {
        "@id": "https://citia-engineering.com/id/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05#breadcrumb"
      },
      "dateModified": "2026-08-04",
      "mainEntity": {
        "@id": "https://citia-engineering.com/id/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05#entity"
      }
    },
    {
      "@type": "BreadcrumbList",
      "@id": "https://citia-engineering.com/id/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05#breadcrumb",
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "Citia",
          "item": "https://citia-engineering.com/id"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Proyek",
          "item": "https://citia-engineering.com/id/projects"
        },
        {
          "@type": "ListItem",
          "position": 3,
          "name": "HPM: Rolls Royce, Genset Data Center JKT02 & JKT05",
          "item": "https://citia-engineering.com/id/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05"
        }
      ]
    },
    {
      "@id": "https://citia-engineering.com/id/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05#entity",
      "url": "https://citia-engineering.com/id/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05",
      "mainEntityOfPage": {
        "@id": "https://citia-engineering.com/id/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05#webpage"
      },
      "@type": "Article",
      "headline": "HPM: Rolls Royce, Genset Data Center JKT02 & JKT05",
      "description": "Generator Installation, QA/QC Inspection, Testing & Commissioning Documentation Dokumen ini merupakan kumpulan dokumentasi teknis yang disusun sebagai bagian dari pelaksanaan JKT02 Project dan JKT05 Project , yang mencakup…",
      "dateModified": "2026-08-04",
      "author": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "inLanguage": "id",
      "image": "https://citia-engineering.com/media/field/datacenter-genset-bank-01-1024.webp",
      "about": [
        {
          "@type": "Thing",
          "name": "Panel"
        },
        {
          "@type": "Thing",
          "name": "Lainnya"
        }
      ],
      "contentLocation": {
        "@type": "Place",
        "name": "Jakarta, Jawa Barat",
        "address": {
          "@type": "PostalAddress",
          "addressLocality": "Jakarta",
          "addressRegion": "Jawa Barat",
          "addressCountry": "ID"
        }
      }
    }
  ]
}
```