---
title: "Pemulihan komunikasi PressMon Balongan | Citia"
description: "Maintenance jaringan komunikasi dan panel PressMon Maintenance & Upgrade Converter PressMon Balongan PT Pertamina Patra Niaga Overview Pekerjaan Maintenance…"
url: https://citia-engineering.com/id/projects/balongan-pressure-network
language: id
updated: 2026-08-04
type: project
site: Citia Engineering Indonesia
---

# Pemulihan komunikasi PressMon Balongan

Maintenance jaringan komunikasi dan panel PressMon

| Info | Isi |
| --- | --- |
| Tahun | 2025 |
| Lokasi | Indramayu, Jawa Barat |
| Status | Selesai |
| Peran Citia | Maintenance dan normalisasi komunikasi |
| Jenis pekerjaan | Instrumentation |
| Diperbarui | 2026-08-04 |

Pekerjaan meliputi penggantian converter fiber optic, perakitan panel, instalasi, normalisasi koneksi dan pengujian fungsi. Catatan proyek mendokumentasikan pemulihan hubungan panel lapangan dengan control room serta pemeriksaan tampilan SCADA/web dan fungsi alarm sesuai lingkup pekerjaan.

## Tentang pekerjaan ini

### Maintenance & Upgrade Converter PressMon Balongan

**PT Pertamina Patra Niaga**

### Overview

Pekerjaan **Maintenance PressMon Balongan** dilaksanakan untuk memulihkan keandalan jaringan komunikasi pada sistem **Pressure Monitoring dan Emergency Shutdown System (ESD)** di jalur pipa BBM Balongan–Plumpang. Sistem tersebut menggunakan jaringan fiber optic untuk menghubungkan pressure transmitter, perangkat RTU/PLC, panel lapangan, dan SCADA di control room.

Pada kondisi awal ditemukan gangguan komunikasi berupa *intermittent loss*, keterlambatan data, dan terputusnya koneksi antarperangkat. Gangguan tersebut terutama disebabkan oleh degradasi converter fiber optic dan ketidakstabilan konektivitas jaringan. Pekerjaan difokuskan pada survei sistem, penggantian converter lama, normalisasi jaringan komunikasi, instalasi panel baru, serta pengujian fungsi monitoring dan shutdown.

### Challenges

Hasil survei menunjukkan beberapa kondisi yang memengaruhi keandalan sistem PressMon, antara lain:

- Converter fiber optic di area control room mengalami error dan tidak dapat menerima sinyal dari perangkat lapangan.
- Status pompa pada SCADA terbaca *fault* akibat terputusnya komunikasi.
- Jalur komunikasi menuju pompa booster tidak dapat mengirimkan status operasi maupun perintah trigger shutdown.
- Kerusakan converter menyebabkan fungsi ESD tidak berjalan secara normal.
- Converter pada panel lapangan tidak menerima sinyal dari control room.
- Proses penggantian harus dilaksanakan dalam *window time* yang terkoordinasi agar tidak mengganggu operasional fasilitas.

### Solutions

Tindakan maintenance dan upgrade yang dilakukan mencakup:

1. Melakukan survei dan pemetaan lokasi converter serta jalur komunikasi fiber optic pada control room dan panel lapangan.
2. Mengidentifikasi converter yang rusak dan melakukan verifikasi gangguan melalui tampilan SCADA.
3. Mengganti converter fiber optic lama dengan perangkat baru yang memiliki performa lebih stabil serta perlindungan lebih baik terhadap surge dan noise.
4. Melakukan perakitan wiring dan panel converter di workshop untuk meminimalkan modifikasi saat instalasi di lapangan.
5. Merakit converter, terminal fiber optic, power supply, interface I/O, dan kelengkapan panel lainnya.
6. Memasang panel upgrade di control room, termasuk penataan ulang kabel power dan fiber optic menggunakan ducting dan cable ties.
7. Melaksanakan *power-up test*, pemeriksaan indikator converter, pengujian input-output, continuity test, dan verifikasi komunikasi bersama operator.
8. Melakukan pengujian alarm dan shutdown berdasarkan perubahan tekanan untuk memastikan respons sistem PressMon dan ESD.

Perakitan dan pengujian awal dilakukan di workshop sebelum instalasi agar panel siap dipasang dan risiko pekerjaan ulang di lapangan dapat dikurangi.

### Results

Setelah proses upgrade, komunikasi fiber optic berhasil terhubung kembali dengan kualitas sinyal yang stabil. Seluruh indikator converter berada dalam kondisi normal, jalur wiring merespons sesuai parameter, dan continuity test tidak menunjukkan adanya hubungan pendek.

Data pressure, status perangkat, dan alarm dapat kembali terbaca secara real-time pada SCADA dan web PressMon. Pengujian lapangan juga menunjukkan bahwa alarm serta fungsi shutdown dapat merespons ketika tekanan mencapai kondisi yang telah ditentukan. Berdasarkan hasil pengujian dalam laporan, sistem dinyatakan layak digunakan kembali untuk fungsi monitoring dan kontrol.

### Lessons Learned

Keandalan Pressure Monitoring System tidak hanya ditentukan oleh pressure transmitter, PLC, atau aplikasi SCADA, tetapi juga sangat bergantung pada kualitas infrastruktur komunikasinya. Kerusakan converter fiber optic dapat menyebabkan hilangnya data, status pompa terbaca tidak valid, dan fungsi ESD tidak dapat bekerja sebagaimana dirancang.

Perakitan serta pengujian panel di workshop terbukti membantu mengurangi waktu instalasi dan risiko modifikasi di lapangan. Selain itu, pengujian tidak cukup hanya memastikan koneksi jaringan aktif, tetapi juga harus mencakup verifikasi data real-time, status pompa, alarm, input-output, serta fungsi shutdown secara menyeluruh.

Untuk menjaga keandalan sistem jangka panjang, kondisi converter, power supply, konektor fiber optic, kualitas sinyal, alarm komunikasi, dan log kejadian perlu diperiksa secara berkala.

## Produk terkait

- [CATALYST PressMon](https://citia-engineering.com/id/products/pressure-monitoring.md): CATALYST PressMon adalah sistem pemantauan tekanan pipa yang menampilkan tekanan live dari transmitter lapangan di control room, dengan histori dan alarm.

## Kontak

- Perusahaan: PT Citia Engineering Indonesia
- Email: services@citiaengineering.com
- Telepon: +62 21 278 20286
- Kantor: Jl. Kaimun Jaya No. 1, Cilandak Barat, Jakarta Selatan, DKI Jakarta 12430, Indonesia

[Hubungi Citia](https://citia-engineering.com/id/contact.md)

## Data terstruktur (JSON-LD)

```json
{
  "@context": "https://schema.org",
  "@graph": [
    {
      "@type": "Organization",
      "@id": "https://citia-engineering.com/#organization",
      "name": "Citia Engineering Indonesia",
      "legalName": "PT Citia Engineering Indonesia",
      "alternateName": "Citia",
      "url": "https://citia-engineering.com",
      "logo": {
        "@type": "ImageObject",
        "url": "https://citia-engineering.com/media/citia-logo.png",
        "width": 950,
        "height": 328
      },
      "description": "Citia adalah perusahaan engineering dan integrasi sistem di Jakarta. Kami menghubungkan perangkat lapangan, PLC dan SCADA, software terminal dan sistem enterprise, lalu memasang, menguji dan merawatnya.",
      "email": "services@citiaengineering.com",
      "telephone": "+62 21 278 20286",
      "address": {
        "@type": "PostalAddress",
        "streetAddress": "Jl. Kaimun Jaya No. 1, Cilandak Barat",
        "addressLocality": "Jakarta Selatan",
        "addressRegion": "DKI Jakarta",
        "postalCode": "12430",
        "addressCountry": "ID"
      },
      "contactPoint": {
        "@type": "ContactPoint",
        "contactType": "customer service",
        "email": "services@citiaengineering.com",
        "telephone": "+62 21 278 20286",
        "url": "https://citia-engineering.com/id/contact"
      },
      "areaServed": {
        "@type": "Country",
        "name": "Indonesia"
      },
      "knowsAbout": [
        "Otomasi & operasi terminal",
        "Tank farm & inventory",
        "Sistem kontrol & instrumentasi",
        "Reliability & lifecycle",
        "Industrial IoT & pemantauan",
        "Instalasi & site engineering",
        "INTEGRA: Software yang menjalankan operasi terminal",
        "CATALYST: Perangkat dan gateway yang mengumpulkan data lapangan",
        "Services: Engineering yang merancang, memasang, mengintegrasikan dan merawat keduanya"
      ]
    },
    {
      "@type": "WebSite",
      "@id": "https://citia-engineering.com/#website",
      "url": "https://citia-engineering.com",
      "name": "Citia Engineering Indonesia",
      "inLanguage": [
        "en",
        "id"
      ],
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "potentialAction": [
        {
          "@type": "SearchAction",
          "name": "Search Citia News",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/en/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        },
        {
          "@type": "SearchAction",
          "name": "Cari di News Citia",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/id/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        }
      ]
    },
    {
      "@type": "WebPage",
      "@id": "https://citia-engineering.com/id/projects/balongan-pressure-network#webpage",
      "url": "https://citia-engineering.com/id/projects/balongan-pressure-network",
      "name": "Pemulihan komunikasi PressMon Balongan",
      "description": "Maintenance jaringan komunikasi dan panel PressMon Maintenance & Upgrade Converter PressMon Balongan PT Pertamina Patra Niaga Overview Pekerjaan Maintenance…",
      "inLanguage": "id",
      "isPartOf": {
        "@id": "https://citia-engineering.com/#website"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "about": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "breadcrumb": {
        "@id": "https://citia-engineering.com/id/projects/balongan-pressure-network#breadcrumb"
      },
      "dateModified": "2026-08-04",
      "mainEntity": {
        "@id": "https://citia-engineering.com/id/projects/balongan-pressure-network#entity"
      }
    },
    {
      "@type": "BreadcrumbList",
      "@id": "https://citia-engineering.com/id/projects/balongan-pressure-network#breadcrumb",
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "Citia",
          "item": "https://citia-engineering.com/id"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Proyek",
          "item": "https://citia-engineering.com/id/projects"
        },
        {
          "@type": "ListItem",
          "position": 3,
          "name": "Pemulihan komunikasi PressMon Balongan",
          "item": "https://citia-engineering.com/id/projects/balongan-pressure-network"
        }
      ]
    },
    {
      "@id": "https://citia-engineering.com/id/projects/balongan-pressure-network#entity",
      "url": "https://citia-engineering.com/id/projects/balongan-pressure-network",
      "mainEntityOfPage": {
        "@id": "https://citia-engineering.com/id/projects/balongan-pressure-network#webpage"
      },
      "@type": "Article",
      "headline": "Pemulihan komunikasi PressMon Balongan",
      "description": "Maintenance jaringan komunikasi dan panel PressMon",
      "dateModified": "2026-08-04",
      "author": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "inLanguage": "id",
      "about": [
        {
          "@type": "Thing",
          "name": "Instrumentation"
        }
      ],
      "mentions": [
        {
          "@id": "https://citia-engineering.com/id/products/pressure-monitoring#entity"
        }
      ],
      "contentLocation": {
        "@type": "Place",
        "name": "Indramayu, Jawa Barat",
        "address": {
          "@type": "PostalAddress",
          "addressLocality": "Indramayu",
          "addressRegion": "Jawa Barat",
          "addressCountry": "ID"
        }
      }
    }
  ]
}
```
