---
title: "ABB - IKDC Phase 3 | Citia"
description: "Project ABB IKDC Phase 3 dilaksanakan untuk mendukung instalasi, integrasi, serta pengujian sistem kelistrikan dan otomasi."
url: https://citia-engineering.com/id/projects/abb-ikdc-phase-3
language: id
updated: 2026-08-06
type: project
site: Citia Engineering Indonesia
---

# ABB - IKDC Phase 3

Project ABB IKDC Phase 3 dilaksanakan untuk mendukung instalasi, integrasi, serta pengujian sistem kelistrikan dan otomasi.

| Info | Isi |
| --- | --- |
| Tahun | 2021 |
| Lokasi | Bogor, Jawa Barat |
| Status | Selesai |
| Jenis pekerjaan | Panel, Lainnya |
| Diperbarui | 2026-08-06 |

![Deretan panel switchgear dan pekerja di ruang listrik di Pusat data Bogor](https://citia-engineering.com/media/field/datacenter-switchgear-hall-01-1024.webp)

## Tentang pekerjaan ini

### Overview

Project ABB – IKDC Phase 3 bertujuan mendukung instalasi, integrasi, dan commissioning sistem kelistrikan serta otomasi untuk memastikan seluruh peralatan beroperasi secara aman, andal, dan sesuai spesifikasi teknis. Ruang lingkup pekerjaan meliputi instalasi panel, terminasi kabel, konfigurasi perangkat, pengujian fungsi, troubleshooting, serta verifikasi sistem sebelum diserahkan kepada pengguna.

### Challenges

- Integrasi sistem baru dengan infrastruktur dan peralatan yang sudah ada.
- Menyelesaikan pekerjaan sesuai jadwal proyek tanpa mengurangi kualitas instalasi.
- Memastikan seluruh komunikasi, kontrol, dan proteksi sistem berfungsi dengan baik sebelum commissioning.
- Menjaga kepatuhan terhadap standar keselamatan kerja selama pelaksanaan proyek.

### Solutions

- Melakukan inspeksi instalasi, verifikasi wiring, dan pengecekan konfigurasi sebelum pengujian.
- Melaksanakan continuity test, I/O test, dan functional test untuk memastikan seluruh sistem bekerja sesuai desain.
- Melakukan troubleshooting dan penyesuaian konfigurasi hingga seluruh fungsi sistem berjalan normal.
- Menerapkan prosedur HSSE secara konsisten serta berkoordinasi dengan seluruh tim proyek selama pelaksanaan pekerjaan.

### Lesson Learned

- Verifikasi instalasi dan konfigurasi sejak awal dapat mengurangi waktu troubleshooting saat commissioning.
- Koordinasi yang baik antar tim meningkatkan efisiensi pelaksanaan proyek dan mempercepat penyelesaian pekerjaan.
- Dokumentasi hasil pengujian dan konfigurasi sistem sangat penting untuk mendukung operasi dan pemeliharaan.
- Pengujian menyeluruh sebelum serah terima meningkatkan keandalan sistem dan memastikan seluruh fungsi berjalan sesuai kebutuhan operasional.

## Kontak

- Perusahaan: PT Citia Engineering Indonesia
- Email: services@citiaengineering.com
- Telepon: +62 21 278 20286
- Kantor: Jl. Kaimun Jaya No. 1, Cilandak Barat, Jakarta Selatan, DKI Jakarta 12430, Indonesia

[Hubungi Citia](https://citia-engineering.com/id/contact.md)

## Data terstruktur (JSON-LD)

```json
{
  "@context": "https://schema.org",
  "@graph": [
    {
      "@type": "Organization",
      "@id": "https://citia-engineering.com/#organization",
      "name": "Citia Engineering Indonesia",
      "legalName": "PT Citia Engineering Indonesia",
      "alternateName": "Citia",
      "url": "https://citia-engineering.com",
      "logo": {
        "@type": "ImageObject",
        "url": "https://citia-engineering.com/media/citia-logo.png",
        "width": 950,
        "height": 328
      },
      "description": "Citia adalah perusahaan engineering dan integrasi sistem di Jakarta. Kami menghubungkan perangkat lapangan, PLC dan SCADA, software terminal dan sistem enterprise, lalu memasang, menguji dan merawatnya.",
      "email": "services@citiaengineering.com",
      "telephone": "+62 21 278 20286",
      "address": {
        "@type": "PostalAddress",
        "streetAddress": "Jl. Kaimun Jaya No. 1, Cilandak Barat",
        "addressLocality": "Jakarta Selatan",
        "addressRegion": "DKI Jakarta",
        "postalCode": "12430",
        "addressCountry": "ID"
      },
      "contactPoint": {
        "@type": "ContactPoint",
        "contactType": "customer service",
        "email": "services@citiaengineering.com",
        "telephone": "+62 21 278 20286",
        "url": "https://citia-engineering.com/id/contact"
      },
      "areaServed": {
        "@type": "Country",
        "name": "Indonesia"
      },
      "knowsAbout": [
        "Otomasi & operasi terminal",
        "Tank farm & inventory",
        "Sistem kontrol & instrumentasi",
        "Reliability & lifecycle",
        "Industrial IoT & pemantauan",
        "Instalasi & site engineering",
        "INTEGRA: Software yang menjalankan operasi terminal",
        "CATALYST: Perangkat dan gateway yang mengumpulkan data lapangan",
        "Services: Engineering yang merancang, memasang, mengintegrasikan dan merawat keduanya"
      ]
    },
    {
      "@type": "WebSite",
      "@id": "https://citia-engineering.com/#website",
      "url": "https://citia-engineering.com",
      "name": "Citia Engineering Indonesia",
      "inLanguage": [
        "en",
        "id"
      ],
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "potentialAction": [
        {
          "@type": "SearchAction",
          "name": "Search Citia News",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/en/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        },
        {
          "@type": "SearchAction",
          "name": "Cari di News Citia",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/id/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        }
      ]
    },
    {
      "@type": "WebPage",
      "@id": "https://citia-engineering.com/id/projects/abb-ikdc-phase-3#webpage",
      "url": "https://citia-engineering.com/id/projects/abb-ikdc-phase-3",
      "name": "ABB - IKDC Phase 3",
      "description": "Project ABB IKDC Phase 3 dilaksanakan untuk mendukung instalasi, integrasi, serta pengujian sistem kelistrikan dan otomasi.",
      "inLanguage": "id",
      "isPartOf": {
        "@id": "https://citia-engineering.com/#website"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "about": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "breadcrumb": {
        "@id": "https://citia-engineering.com/id/projects/abb-ikdc-phase-3#breadcrumb"
      },
      "dateModified": "2026-08-06",
      "mainEntity": {
        "@id": "https://citia-engineering.com/id/projects/abb-ikdc-phase-3#entity"
      }
    },
    {
      "@type": "BreadcrumbList",
      "@id": "https://citia-engineering.com/id/projects/abb-ikdc-phase-3#breadcrumb",
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "Citia",
          "item": "https://citia-engineering.com/id"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Proyek",
          "item": "https://citia-engineering.com/id/projects"
        },
        {
          "@type": "ListItem",
          "position": 3,
          "name": "ABB - IKDC Phase 3",
          "item": "https://citia-engineering.com/id/projects/abb-ikdc-phase-3"
        }
      ]
    },
    {
      "@id": "https://citia-engineering.com/id/projects/abb-ikdc-phase-3#entity",
      "url": "https://citia-engineering.com/id/projects/abb-ikdc-phase-3",
      "mainEntityOfPage": {
        "@id": "https://citia-engineering.com/id/projects/abb-ikdc-phase-3#webpage"
      },
      "@type": "Article",
      "headline": "ABB - IKDC Phase 3",
      "description": "Project ABB IKDC Phase 3 dilaksanakan untuk mendukung instalasi, integrasi, serta pengujian sistem kelistrikan dan otomasi.",
      "dateModified": "2026-08-06",
      "author": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "inLanguage": "id",
      "image": "https://citia-engineering.com/media/field/datacenter-switchgear-hall-01-1024.webp",
      "about": [
        {
          "@type": "Thing",
          "name": "Panel"
        },
        {
          "@type": "Thing",
          "name": "Lainnya"
        }
      ],
      "contentLocation": {
        "@type": "Place",
        "name": "Bogor, Jawa Barat",
        "address": {
          "@type": "PostalAddress",
          "addressLocality": "Bogor",
          "addressRegion": "Jawa Barat",
          "addressCountry": "ID"
        }
      }
    }
  ]
}
```
