---
title: "Riwayat Proyek Otomasi Indonesia 2020 sampai 2026 | Citia"
description: "Seluruh proyek yang dicatat Citia sejak 2020, bisa disaring menurut tahun, status dan kota, dengan halaman cerita proyek dan peta lokasi kerja di Indonesia."
url: https://citia-engineering.com/id/projects
language: id
updated: 2026-10-15
type: index
site: Citia Engineering Indonesia
---

# Riwayat proyek Citia

Seluruh proyek yang dicatat Citia sejak 2020, bisa disaring menurut tahun, status dan kota, dengan halaman cerita proyek dan peta lokasi kerja di Indonesia.

| Info | Isi |
| --- | --- |
| Catatan proyek | 201 |
| Rentang tahun | 2020 to 2026 |
| Berjalan | 8 |
| Kota tercatat | 27 |
| Dengan halaman cerita | 52 |

## Proyek dengan halaman cerita

| Proyek | Tahun | Lokasi | Status |
| --- | --- | --- | --- |
| [PGE Kamojang - Rekonstruksi Chasing dan Penambahan Control Valve](https://citia-engineering.com/id/projects/pge-kamojang-casing-reconstruction-and-added-control-valve.md) | 2026 | Garut, Jawa Barat | Berjalan |
| [Pengadaan I/O Digital Output Allen Bradley PLC dan Converter Moxa](https://citia-engineering.com/id/projects/supply-of-allen-bradley-plc-digital-output-modules-and-moxa-converter.md) | 2026 | Karawang, Jawa Barat | Berjalan |
| [Komunikasi MOV](https://citia-engineering.com/id/projects/motor-operated-valve-mov-communication.md) | 2026 |  | Berjalan |
| [Pertamina Terminal Jambi - Integrasi Meter 5 & 6](https://citia-engineering.com/id/projects/pertamina-jambi-terminal-integration-of-meters-5-and-6.md) | 2026 | Jambi | Selesai |
| [Alur distribusi Fuel Terminal Jambi](https://citia-engineering.com/id/projects/jambi-terminal-automation.md) | 2026 | Jambi | Selesai |
| [Dukungan lifecycle TAS Padalarang](https://citia-engineering.com/id/projects/padalarang-tas-lifecycle.md) | 2026 | Bandung Barat, Jawa Barat | Berjalan |
| [Prototype Pressmon Balongan](https://citia-engineering.com/id/projects/pressmon-prototype-for-balongan.md) | 2026 | Indramayu, Jawa Barat | Selesai |
| [Putranata Jasa Terminasi LOC-III RU IV Cilacap](https://citia-engineering.com/id/projects/putranata-termination-services-at-loc-iii-ru-iv-cilacap.md) | 2026 | Cilacap, Jawa Tengah | Selesai |
| [Redeco: lampu Suar Marine Lantern](https://citia-engineering.com/id/projects/redeco-marine-lantern-beacon.md) | 2026 | Cilegon, Banten | Selesai |
| [Assessment Grounding System LPG Balongan](https://citia-engineering.com/id/projects/grounding-system-assessment-lpg-balongan.md) | 2026 | Indramayu, Jawa Barat | Selesai |
| [Update Produk B50 TBBM Padalarang](https://citia-engineering.com/id/projects/b50-product-update-padalarang-fuel-terminal.md) | 2026 |  | Selesai |
| [TBBM Jambi: Penggantian Spare Part Gateway ATG (ECU)](https://citia-engineering.com/id/projects/jambi-fuel-terminal-replacement-of-atg-gateway-ecu-spare-part.md) | 2026 | Jambi | Berjalan |
| [Pemulihan komunikasi PressMon Balongan](https://citia-engineering.com/id/projects/balongan-pressure-network.md) | 2025 | Indramayu, Jawa Barat | Selesai |
| [Pembaruan monitoring tangki Cikampek](https://citia-engineering.com/id/projects/cikampek-tank-monitoring.md) | 2025 | Jawa Barat | Selesai |
| [Pertamina IT Bitung: Normalisasi PLC Pompa](https://citia-engineering.com/id/projects/pertamina-bitung-integrated-terminal-pump-plc-restoration.md) | 2025 | Bitung, Sulawesi Utara | Selesai |
| [Pertamina ITJ LPG Priok - Penggantian Transmitter Area PMB III & IV](https://citia-engineering.com/id/projects/pertamina-itj-lpg-priok-transmitter-replacement-in-areas-pmb-iii-and-iv.md) | 2025 | Jakarta Utara, DKI Jakarta | Selesai |
| [Pertamina Priok: Normalisasi Sistem Unloading & Backloading](https://citia-engineering.com/id/projects/pertamina-priok-unloading-and-backloading-system-restoration.md) | 2025 | Jakarta Utara, DKI Jakarta | Selesai |
| [Pertamina Pulau Baai ESD Pompa](https://citia-engineering.com/id/projects/pertamina-pulau-baai-pump-emergency-shutdown-esd.md) | 2025 | Bengkulu | Selesai |
| [Pertamina Pulau Baai Development Smart Seal](https://citia-engineering.com/id/projects/pertamina-pulau-baai-smart-seal-development.md) | 2025 | Bengkulu | Selesai |
| [Pertamina Pulau Layang: Integrasi Metering Avtur](https://citia-engineering.com/id/projects/pertamina-pulau-layang-aviation-fuel-metering-integration.md) | 2025 | Palembang, Sumatera Selatan | Selesai |
| [Otomasi distribusi Pulau Layang](https://citia-engineering.com/id/projects/pulau-layang-terminal.md) | 2025 | Palembang, Sumatera Selatan | Berjalan |
| [Redeco Services Modul Power Supply ATG](https://citia-engineering.com/id/projects/redeco-atg-power-supply-module-service.md) | 2025 | Cilegon, Banten | Selesai |
| [Jasa Pemasangan UPS Panel PLC Depot Donggala](https://citia-engineering.com/id/projects/ups-installation-for-plc-panels-at-donggala-depot.md) | 2025 | Donggala, Sulawesi Tengah | Selesai |
| [Eltech: Integrasi IP HMI](https://citia-engineering.com/id/projects/eltech-hmi-ip-integration.md) | 2024 | Bekasi, Jawa Barat | Selesai |
| [Pemasangan Fire Alarm Sistem RSUD Al Ihsan](https://citia-engineering.com/id/projects/fire-alarm-system-installation-at-al-ihsan-regional-hospital.md) | 2024 | Bandung, Jawa Barat | Selesai |
| [HPM: Rolls Royce, Genset Data Center JKT02 & JKT05](https://citia-engineering.com/id/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05.md) | 2024 | Jakarta, Jawa Barat | Selesai |
| [Indosat: Pertamina, SMART MT 79 unit, Docking](https://citia-engineering.com/id/projects/indosat-and-pertamina-docking-for-79-smart-mt-units.md) | 2024 | Bandung, Jawa Barat | Selesai |
| [Aroja: Pertamina Lubuk Linggau, Level Alarm](https://citia-engineering.com/id/projects/level-alarm-at-pertamina-lubuk-linggau-aroja.md) | 2024 | Lubuklinggau, Sumatera Selatan | Selesai |
| [Putranata: Terminasi 3 Area TA, RU IV Cilacap](https://citia-engineering.com/id/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap.md) | 2024 | Cilacap, Jawa Tengah | Selesai |
| [Penelusuran gangguan ATG Redeco](https://citia-engineering.com/id/projects/redeco-atg-assessment.md) | 2024 |  | Selesai |
| [Troubleshooting PLC ABB](https://citia-engineering.com/id/projects/abb-plc-troubleshooting.md) | 2023 | Bandung, Jawa Barat | Selesai |
| [Kontrol & instrumentasi EWTP Balongan](https://citia-engineering.com/id/projects/balongan-ewtp.md) | 2023 | Jawa Barat | Selesai |
| [AQMS Cirebon Power](https://citia-engineering.com/id/projects/cirebon-power-aqms.md) | 2023 | Cirebon, Jawa Barat | Selesai |
| [KF: Flowmeter](https://citia-engineering.com/id/projects/kf-flowmeter.md) | 2023 | Bandung, Jawa Barat | Selesai |
| [MPS: Hasakona](https://citia-engineering.com/id/projects/mps-hasakona.md) | 2023 | Balikpapan, Kalimantan Timur | Selesai |
| [Telkomsel: OEE Shei Tai](https://citia-engineering.com/id/projects/telkomsel-oee-for-shei-tai.md) | 2023 | Bandung, Jawa Barat | Selesai |
| [Adaro - Sistem Monitoring Level Air](https://citia-engineering.com/id/projects/adaro-water-level-monitoring-system.md) | 2022 | Barito Selatan, Kalimantan Tengah | Selesai |
| [LTSA LPG Panjang](https://citia-engineering.com/id/projects/ltsa-for-lpg-panjang.md) | 2022 |  | Selesai |
| [Konektivitas mesin & OEE Rich](https://citia-engineering.com/id/projects/rich-machine-connectivity.md) | 2022 | Serang, Banten | Selesai |
| [Optimalisasi Sistem VSD](https://citia-engineering.com/id/projects/vsd-system-optimization.md) | 2022 |  | Selesai |
| [ABB - IKDC Phase 3](https://citia-engineering.com/id/projects/abb-ikdc-phase-3.md) | 2021 | Bogor, Jawa Barat | Selesai |
| [ABB: Amazon 61](https://citia-engineering.com/id/projects/abb-amazon-61.md) | 2020 | Bogor, Jawa Barat | Selesai |
| [ABB: Amazon 62](https://citia-engineering.com/id/projects/abb-amazon-62.md) | 2020 | Bogor, Jawa Barat | Selesai |
| [ABB: Keppel](https://citia-engineering.com/id/projects/abb-keppel.md) | 2020 | Bogor, Jawa Barat | Selesai |
| [Programming ABB DCS di TBBM Lomanis](https://citia-engineering.com/id/projects/abb-dcs-programming-at-lomanis-fuel-terminal.md) | 2020 | Lomanis, Jawa Tengah | Selesai |
| [ABB: IndoKeppel Data Center, Supervisi & Terminasi](https://citia-engineering.com/id/projects/abb-indokeppel-data-center-supervision-and-termination.md) | 2020 | Bogor, Jawa Barat | Selesai |
| [Banjarbakula](https://citia-engineering.com/id/projects/banjarbakula.md) | 2020 | Banjarbaru, Kalimantan Selatan | Selesai |
| [IP: Saguling, Rekondisi PDM](https://citia-engineering.com/id/projects/ip-saguling-pdm-reconditioning.md) | 2020 | Purwakarta, Jawa Barat | Selesai |
| [Petro: Repair PLC ABB](https://citia-engineering.com/id/projects/petrokimia-gresik-abb-plc-repair.md) | 2020 |  | Selesai |
| [Troubleshooting SCADA Chiller Mayora](https://citia-engineering.com/id/projects/scada-chiller-troubleshooting-at-mayora.md) | 2020 | Cianjur, Jawa Barat | Selesai |
| [Cirebon Power: Annual Maintenance AQMS](https://citia-engineering.com/id/projects/cirebon-power-annual-aqms-maintenance.md) |  | Cirebon, Jawa Barat | Selesai |
| [Rekondisi Modul PAGA](https://citia-engineering.com/id/projects/paga-module-reconditioning.md) |  | Bandung, Jawa Barat | Selesai |

## Kontak

- Perusahaan: PT Citia Engineering Indonesia
- Email: services@citiaengineering.com
- Telepon: +62 21 278 20286
- Kantor: Jl. Kaimun Jaya No. 1, Cilandak Barat, Jakarta Selatan, DKI Jakarta 12430, Indonesia

[Hubungi Citia](https://citia-engineering.com/id/contact.md)

## Data terstruktur (JSON-LD)

```json
{
  "@context": "https://schema.org",
  "@graph": [
    {
      "@type": "Organization",
      "@id": "https://citia-engineering.com/#organization",
      "name": "Citia Engineering Indonesia",
      "legalName": "PT Citia Engineering Indonesia",
      "alternateName": "Citia",
      "url": "https://citia-engineering.com",
      "logo": {
        "@type": "ImageObject",
        "url": "https://citia-engineering.com/media/citia-logo.png",
        "width": 950,
        "height": 328
      },
      "description": "Citia adalah perusahaan engineering dan integrasi sistem di Jakarta. Kami menghubungkan perangkat lapangan, PLC dan SCADA, software terminal dan sistem enterprise, lalu memasang, menguji dan merawatnya.",
      "email": "services@citiaengineering.com",
      "telephone": "+62 21 278 20286",
      "address": {
        "@type": "PostalAddress",
        "streetAddress": "Jl. Kaimun Jaya No. 1, Cilandak Barat",
        "addressLocality": "Jakarta Selatan",
        "addressRegion": "DKI Jakarta",
        "postalCode": "12430",
        "addressCountry": "ID"
      },
      "contactPoint": {
        "@type": "ContactPoint",
        "contactType": "customer service",
        "email": "services@citiaengineering.com",
        "telephone": "+62 21 278 20286",
        "url": "https://citia-engineering.com/id/contact"
      },
      "areaServed": {
        "@type": "Country",
        "name": "Indonesia"
      },
      "knowsAbout": [
        "Otomasi & operasi terminal",
        "Tank farm & inventory",
        "Sistem kontrol & instrumentasi",
        "Reliability & lifecycle",
        "Industrial IoT & pemantauan",
        "Instalasi & site engineering",
        "INTEGRA: Software yang menjalankan operasi terminal",
        "CATALYST: Perangkat dan gateway yang mengumpulkan data lapangan",
        "Services: Engineering yang merancang, memasang, mengintegrasikan dan merawat keduanya"
      ]
    },
    {
      "@type": "WebSite",
      "@id": "https://citia-engineering.com/#website",
      "url": "https://citia-engineering.com",
      "name": "Citia Engineering Indonesia",
      "inLanguage": [
        "en",
        "id"
      ],
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "potentialAction": [
        {
          "@type": "SearchAction",
          "name": "Search Citia News",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/en/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        },
        {
          "@type": "SearchAction",
          "name": "Cari di News Citia",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/id/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        }
      ]
    },
    {
      "@type": "CollectionPage",
      "@id": "https://citia-engineering.com/id/projects#webpage",
      "url": "https://citia-engineering.com/id/projects",
      "name": "Riwayat Proyek Otomasi Indonesia 2020 sampai 2026",
      "description": "Seluruh proyek yang dicatat Citia sejak 2020, bisa disaring menurut tahun, status dan kota, dengan halaman cerita proyek dan peta lokasi kerja di Indonesia.",
      "inLanguage": "id",
      "isPartOf": {
        "@id": "https://citia-engineering.com/#website"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "about": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "breadcrumb": {
        "@id": "https://citia-engineering.com/id/projects#breadcrumb"
      },
      "dateModified": "2026-10-15",
      "mainEntity": {
        "@id": "https://citia-engineering.com/id/projects#list"
      }
    },
    {
      "@type": "BreadcrumbList",
      "@id": "https://citia-engineering.com/id/projects#breadcrumb",
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "Citia",
          "item": "https://citia-engineering.com/id"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Proyek",
          "item": "https://citia-engineering.com/id/projects"
        }
      ]
    },
    {
      "@id": "https://citia-engineering.com/id/projects#list",
      "@type": "ItemList",
      "numberOfItems": 52,
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "PGE Kamojang - Rekonstruksi Chasing dan Penambahan Control Valve",
          "url": "https://citia-engineering.com/id/projects/pge-kamojang-casing-reconstruction-and-added-control-valve"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Pengadaan I/O Digital Output Allen Bradley PLC dan Converter Moxa",
          "url": "https://citia-engineering.com/id/projects/supply-of-allen-bradley-plc-digital-output-modules-and-moxa-converter"
        },
        {
          "@type": "ListItem",
          "position": 3,
          "name": "Komunikasi MOV",
          "url": "https://citia-engineering.com/id/projects/motor-operated-valve-mov-communication"
        },
        {
          "@type": "ListItem",
          "position": 4,
          "name": "Pertamina Terminal Jambi - Integrasi Meter 5 & 6",
          "url": "https://citia-engineering.com/id/projects/pertamina-jambi-terminal-integration-of-meters-5-and-6"
        },
        {
          "@type": "ListItem",
          "position": 5,
          "name": "Alur distribusi Fuel Terminal Jambi",
          "url": "https://citia-engineering.com/id/projects/jambi-terminal-automation"
        },
        {
          "@type": "ListItem",
          "position": 6,
          "name": "Dukungan lifecycle TAS Padalarang",
          "url": "https://citia-engineering.com/id/projects/padalarang-tas-lifecycle"
        },
        {
          "@type": "ListItem",
          "position": 7,
          "name": "Prototype Pressmon Balongan",
          "url": "https://citia-engineering.com/id/projects/pressmon-prototype-for-balongan"
        },
        {
          "@type": "ListItem",
          "position": 8,
          "name": "Putranata Jasa Terminasi LOC-III RU IV Cilacap",
          "url": "https://citia-engineering.com/id/projects/putranata-termination-services-at-loc-iii-ru-iv-cilacap"
        },
        {
          "@type": "ListItem",
          "position": 9,
          "name": "Redeco: lampu Suar Marine Lantern",
          "url": "https://citia-engineering.com/id/projects/redeco-marine-lantern-beacon"
        },
        {
          "@type": "ListItem",
          "position": 10,
          "name": "Assessment Grounding System LPG Balongan",
          "url": "https://citia-engineering.com/id/projects/grounding-system-assessment-lpg-balongan"
        },
        {
          "@type": "ListItem",
          "position": 11,
          "name": "Update Produk B50 TBBM Padalarang",
          "url": "https://citia-engineering.com/id/projects/b50-product-update-padalarang-fuel-terminal"
        },
        {
          "@type": "ListItem",
          "position": 12,
          "name": "TBBM Jambi: Penggantian Spare Part Gateway ATG (ECU)",
          "url": "https://citia-engineering.com/id/projects/jambi-fuel-terminal-replacement-of-atg-gateway-ecu-spare-part"
        },
        {
          "@type": "ListItem",
          "position": 13,
          "name": "Pemulihan komunikasi PressMon Balongan",
          "url": "https://citia-engineering.com/id/projects/balongan-pressure-network"
        },
        {
          "@type": "ListItem",
          "position": 14,
          "name": "Pembaruan monitoring tangki Cikampek",
          "url": "https://citia-engineering.com/id/projects/cikampek-tank-monitoring"
        },
        {
          "@type": "ListItem",
          "position": 15,
          "name": "Pertamina IT Bitung: Normalisasi PLC Pompa",
          "url": "https://citia-engineering.com/id/projects/pertamina-bitung-integrated-terminal-pump-plc-restoration"
        },
        {
          "@type": "ListItem",
          "position": 16,
          "name": "Pertamina ITJ LPG Priok - Penggantian Transmitter Area PMB III & IV",
          "url": "https://citia-engineering.com/id/projects/pertamina-itj-lpg-priok-transmitter-replacement-in-areas-pmb-iii-and-iv"
        },
        {
          "@type": "ListItem",
          "position": 17,
          "name": "Pertamina Priok: Normalisasi Sistem Unloading & Backloading",
          "url": "https://citia-engineering.com/id/projects/pertamina-priok-unloading-and-backloading-system-restoration"
        },
        {
          "@type": "ListItem",
          "position": 18,
          "name": "Pertamina Pulau Baai ESD Pompa",
          "url": "https://citia-engineering.com/id/projects/pertamina-pulau-baai-pump-emergency-shutdown-esd"
        },
        {
          "@type": "ListItem",
          "position": 19,
          "name": "Pertamina Pulau Baai Development Smart Seal",
          "url": "https://citia-engineering.com/id/projects/pertamina-pulau-baai-smart-seal-development"
        },
        {
          "@type": "ListItem",
          "position": 20,
          "name": "Pertamina Pulau Layang: Integrasi Metering Avtur",
          "url": "https://citia-engineering.com/id/projects/pertamina-pulau-layang-aviation-fuel-metering-integration"
        },
        {
          "@type": "ListItem",
          "position": 21,
          "name": "Otomasi distribusi Pulau Layang",
          "url": "https://citia-engineering.com/id/projects/pulau-layang-terminal"
        },
        {
          "@type": "ListItem",
          "position": 22,
          "name": "Redeco Services Modul Power Supply ATG",
          "url": "https://citia-engineering.com/id/projects/redeco-atg-power-supply-module-service"
        },
        {
          "@type": "ListItem",
          "position": 23,
          "name": "Jasa Pemasangan UPS Panel PLC Depot Donggala",
          "url": "https://citia-engineering.com/id/projects/ups-installation-for-plc-panels-at-donggala-depot"
        },
        {
          "@type": "ListItem",
          "position": 24,
          "name": "Eltech: Integrasi IP HMI",
          "url": "https://citia-engineering.com/id/projects/eltech-hmi-ip-integration"
        },
        {
          "@type": "ListItem",
          "position": 25,
          "name": "Pemasangan Fire Alarm Sistem RSUD Al Ihsan",
          "url": "https://citia-engineering.com/id/projects/fire-alarm-system-installation-at-al-ihsan-regional-hospital"
        },
        {
          "@type": "ListItem",
          "position": 26,
          "name": "HPM: Rolls Royce, Genset Data Center JKT02 & JKT05",
          "url": "https://citia-engineering.com/id/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05"
        },
        {
          "@type": "ListItem",
          "position": 27,
          "name": "Indosat: Pertamina, SMART MT 79 unit, Docking",
          "url": "https://citia-engineering.com/id/projects/indosat-and-pertamina-docking-for-79-smart-mt-units"
        },
        {
          "@type": "ListItem",
          "position": 28,
          "name": "Aroja: Pertamina Lubuk Linggau, Level Alarm",
          "url": "https://citia-engineering.com/id/projects/level-alarm-at-pertamina-lubuk-linggau-aroja"
        },
        {
          "@type": "ListItem",
          "position": 29,
          "name": "Putranata: Terminasi 3 Area TA, RU IV Cilacap",
          "url": "https://citia-engineering.com/id/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap"
        },
        {
          "@type": "ListItem",
          "position": 30,
          "name": "Penelusuran gangguan ATG Redeco",
          "url": "https://citia-engineering.com/id/projects/redeco-atg-assessment"
        },
        {
          "@type": "ListItem",
          "position": 31,
          "name": "Troubleshooting PLC ABB",
          "url": "https://citia-engineering.com/id/projects/abb-plc-troubleshooting"
        },
        {
          "@type": "ListItem",
          "position": 32,
          "name": "Kontrol & instrumentasi EWTP Balongan",
          "url": "https://citia-engineering.com/id/projects/balongan-ewtp"
        },
        {
          "@type": "ListItem",
          "position": 33,
          "name": "AQMS Cirebon Power",
          "url": "https://citia-engineering.com/id/projects/cirebon-power-aqms"
        },
        {
          "@type": "ListItem",
          "position": 34,
          "name": "KF: Flowmeter",
          "url": "https://citia-engineering.com/id/projects/kf-flowmeter"
        },
        {
          "@type": "ListItem",
          "position": 35,
          "name": "MPS: Hasakona",
          "url": "https://citia-engineering.com/id/projects/mps-hasakona"
        },
        {
          "@type": "ListItem",
          "position": 36,
          "name": "Telkomsel: OEE Shei Tai",
          "url": "https://citia-engineering.com/id/projects/telkomsel-oee-for-shei-tai"
        },
        {
          "@type": "ListItem",
          "position": 37,
          "name": "Adaro - Sistem Monitoring Level Air",
          "url": "https://citia-engineering.com/id/projects/adaro-water-level-monitoring-system"
        },
        {
          "@type": "ListItem",
          "position": 38,
          "name": "LTSA LPG Panjang",
          "url": "https://citia-engineering.com/id/projects/ltsa-for-lpg-panjang"
        },
        {
          "@type": "ListItem",
          "position": 39,
          "name": "Konektivitas mesin & OEE Rich",
          "url": "https://citia-engineering.com/id/projects/rich-machine-connectivity"
        },
        {
          "@type": "ListItem",
          "position": 40,
          "name": "Optimalisasi Sistem VSD",
          "url": "https://citia-engineering.com/id/projects/vsd-system-optimization"
        },
        {
          "@type": "ListItem",
          "position": 41,
          "name": "ABB - IKDC Phase 3",
          "url": "https://citia-engineering.com/id/projects/abb-ikdc-phase-3"
        },
        {
          "@type": "ListItem",
          "position": 42,
          "name": "ABB: Amazon 61",
          "url": "https://citia-engineering.com/id/projects/abb-amazon-61"
        },
        {
          "@type": "ListItem",
          "position": 43,
          "name": "ABB: Amazon 62",
          "url": "https://citia-engineering.com/id/projects/abb-amazon-62"
        },
        {
          "@type": "ListItem",
          "position": 44,
          "name": "ABB: Keppel",
          "url": "https://citia-engineering.com/id/projects/abb-keppel"
        },
        {
          "@type": "ListItem",
          "position": 45,
          "name": "Programming ABB DCS di TBBM Lomanis",
          "url": "https://citia-engineering.com/id/projects/abb-dcs-programming-at-lomanis-fuel-terminal"
        },
        {
          "@type": "ListItem",
          "position": 46,
          "name": "ABB: IndoKeppel Data Center, Supervisi & Terminasi",
          "url": "https://citia-engineering.com/id/projects/abb-indokeppel-data-center-supervision-and-termination"
        },
        {
          "@type": "ListItem",
          "position": 47,
          "name": "Banjarbakula",
          "url": "https://citia-engineering.com/id/projects/banjarbakula"
        },
        {
          "@type": "ListItem",
          "position": 48,
          "name": "IP: Saguling, Rekondisi PDM",
          "url": "https://citia-engineering.com/id/projects/ip-saguling-pdm-reconditioning"
        },
        {
          "@type": "ListItem",
          "position": 49,
          "name": "Petro: Repair PLC ABB",
          "url": "https://citia-engineering.com/id/projects/petrokimia-gresik-abb-plc-repair"
        },
        {
          "@type": "ListItem",
          "position": 50,
          "name": "Troubleshooting SCADA Chiller Mayora",
          "url": "https://citia-engineering.com/id/projects/scada-chiller-troubleshooting-at-mayora"
        },
        {
          "@type": "ListItem",
          "position": 51,
          "name": "Cirebon Power: Annual Maintenance AQMS",
          "url": "https://citia-engineering.com/id/projects/cirebon-power-annual-aqms-maintenance"
        },
        {
          "@type": "ListItem",
          "position": 52,
          "name": "Rekondisi Modul PAGA",
          "url": "https://citia-engineering.com/id/projects/paga-module-reconditioning"
        }
      ]
    }
  ]
}
```
