title: "Putranata: terminations in three turnaround areas | Citia"
description: "A control panel revitalization and replacement project at the Pertamina Cilacap Refinery, covering three operating areas: KPC, RFCC, and IGB."
url: https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap
language: en
updated: 2026-07-22
type: project
site: Citia Engineering Indonesia
---

# Putranata: terminations in three turnaround areas, RU IV Cilacap

A control panel revitalization and replacement project at the Pertamina Cilacap Refinery, covering three operating areas: KPC, RFCC, and IGB.

| Field | Value |
| --- | --- |
| Year | 2024 |
| Location | Cilacap, Jawa Tengah |
| Status | Finished |
| Work types | PLC, Panel, Safety, HMI, Instrumentation |
| Updated | 2026-07-22 |

![Worker reaching into a wired cabinet at Cilacap Refinery](https://citia-engineering.com/media/field/people-cilacap-panel-terminations-01-1600.webp)

## About this work

**Overview** This project renewed the electrical and control system (*panel replacement/cut-over*) at the Pertamina Cilacap Refinery, in three areas: KPC, RFCC, and IGB. Field execution followed a set sequence. First, *temporary* cables were tagged. Then the existing cables were disconnected and the old panels dismantled, followed by installation of the new panels. Once the panels were in place, the cables were terminated according to the *I/O list* drawings. The work ended with signal validation through a *loop check* together with the instrumentation team, and operational handover through the *Site Acceptance Test* (SAT).

**Challenges**

- **Risk of I/O mismatch:** Dismantling old panels and re-terminating carries a high risk of swapped cables, lost cable identity, or *wiring* errors, which could have serious consequences for the refinery control system.
- **Cut-over time:** The transition from disconnecting cables and *dismantling* panels to having the new panel ready for use had to be managed tightly in time, to avoid long *downtime* in the KPC, RFCC, and IGB areas.
- **Field signal synchronization:** Making sure the field instruments communicate correctly with the new control panel was often held back by the condition of the existing cables and instruments, which are old.

**Solutions**

- **Strict tagging procedure:** A thorough and orderly *temporary cable tagging* procedure was carried out before the cables were disconnected. This gave every cable a clear identity when it was terminated again at the new panel.
- **Work based on the I/O list:** The latest *I/O list* drawing was the single source of truth for technicians during termination, to ensure 100% accuracy.
- **Cross-discipline collaboration:** The instrumentation team worked side by side with us during the *loop check*. This sped up *troubleshooting* whenever a signal anomaly appeared before the SAT stage.

**Lessons learned**

- Spending more time on early preparation, especially *cable tagging* and documentation of the existing cables, sped up the installation phase and kept *rework* during termination to a minimum.
- Involving the instrumentation team directly from the *loop check* phase is essential. Good communication between field teams meant every *punchlist* item was closed quickly, so the *Site Acceptance Test* (SAT) could be approved without obstacles.

## Contact

- Company: PT Citia Engineering Indonesia
- Email: services@citiaengineering.com
- Telephone: +62 21 278 20286
- Office: Jl. Kaimun Jaya No. 1, Cilandak Barat, Jakarta Selatan, DKI Jakarta 12430, Indonesia

[Contact Citia](https://citia-engineering.com/en/contact.md)

## Structured data (JSON-LD)

```json
{
  "@context": "https://schema.org",
  "@graph": [
    {
      "@type": "Organization",
      "@id": "https://citia-engineering.com/#organization",
      "name": "Citia Engineering Indonesia",
      "legalName": "PT Citia Engineering Indonesia",
      "alternateName": "Citia",
      "url": "https://citia-engineering.com",
      "logo": {
        "@type": "ImageObject",
        "url": "https://citia-engineering.com/media/citia-logo.png",
        "width": 950,
        "height": 328
      },
      "description": "Citia is an engineering and system integration company in Jakarta. We connect field devices, PLC and SCADA, terminal software and enterprise systems, then install, test and maintain them.",
      "email": "services@citiaengineering.com",
      "telephone": "+62 21 278 20286",
      "address": {
        "@type": "PostalAddress",
        "streetAddress": "Jl. Kaimun Jaya No. 1, Cilandak Barat",
        "addressLocality": "Jakarta Selatan",
        "addressRegion": "DKI Jakarta",
        "postalCode": "12430",
        "addressCountry": "ID"
      },
      "contactPoint": {
        "@type": "ContactPoint",
        "contactType": "customer service",
        "email": "services@citiaengineering.com",
        "telephone": "+62 21 278 20286",
        "url": "https://citia-engineering.com/en/contact"
      },
      "areaServed": {
        "@type": "Country",
        "name": "Indonesia"
      },
      "knowsAbout": [
        "Terminal automation & operations",
        "Tank farm & inventory",
        "Control systems & instrumentation",
        "Reliability & lifecycle",
        "Industrial IoT & monitoring",
        "Installation & site engineering",
        "INTEGRA: Software that runs terminal operations",
        "CATALYST: Devices and gateways that collect field data",
        "Services: Engineering that designs, installs, integrates and maintains both"
      ]
    },
    {
      "@type": "WebSite",
      "@id": "https://citia-engineering.com/#website",
      "url": "https://citia-engineering.com",
      "name": "Citia Engineering Indonesia",
      "inLanguage": [
        "en",
        "id"
      ],
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "potentialAction": [
        {
          "@type": "SearchAction",
          "name": "Search Citia News",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/en/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        },
        {
          "@type": "SearchAction",
          "name": "Cari di News Citia",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/id/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        }
      ]
    },
    {
      "@type": "WebPage",
      "@id": "https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap#webpage",
      "url": "https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap",
      "name": "Putranata: terminations in three turnaround areas, RU IV Cilacap",
      "description": "A control panel revitalization and replacement project at the Pertamina Cilacap Refinery, covering three operating areas: KPC, RFCC, and IGB.",
      "inLanguage": "en",
      "isPartOf": {
        "@id": "https://citia-engineering.com/#website"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "about": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "breadcrumb": {
        "@id": "https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap#breadcrumb"
      },
      "dateModified": "2026-07-22",
      "mainEntity": {
        "@id": "https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap#entity"
      }
    },
    {
      "@type": "BreadcrumbList",
      "@id": "https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap#breadcrumb",
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "Citia",
          "item": "https://citia-engineering.com/en"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Projects",
          "item": "https://citia-engineering.com/en/projects"
        },
        {
          "@type": "ListItem",
          "position": 3,
          "name": "Putranata: terminations in three turnaround areas, RU IV Cilacap",
          "item": "https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap"
        }
      ]
    },
    {
      "@id": "https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap#entity",
      "url": "https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap",
      "mainEntityOfPage": {
        "@id": "https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap#webpage"
      },
      "@type": "Article",
      "headline": "Putranata: terminations in three turnaround areas, RU IV Cilacap",
      "description": "A control panel revitalization and replacement project at the Pertamina Cilacap Refinery, covering three operating areas: KPC, RFCC, and IGB.",
      "dateModified": "2026-07-22",
      "author": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "inLanguage": "en",
      "image": "https://citia-engineering.com/media/field/people-cilacap-panel-terminations-01-1600.webp",
      "about": [
        {
          "@type": "Thing",
          "name": "PLC"
        },
        {
          "@type": "Thing",
          "name": "Panel"
        },
        {
          "@type": "Thing",
          "name": "Safety"
        },
        {
          "@type": "Thing",
          "name": "HMI"
        },
        {
          "@type": "Thing",
          "name": "Instrumentation"
        }
      ],
      "contentLocation": {
        "@type": "Place",
        "name": "Cilacap, Jawa Tengah",
        "address": {
          "@type": "PostalAddress",
          "addressLocality": "Cilacap",
          "addressRegion": "Jawa Tengah",
          "addressCountry": "ID"
        }
      }
    }
  ]
}
```