---
title: "Banjarbakula | Citia"
description: "The IPA II Banjarbakula project is part of the development of the Banjarbakula Regional Drinking Water Supply System (SPAM) and raises clean water supply…"
url: https://citia-engineering.com/en/projects/banjarbakula
language: en
updated: 2026-08-05
type: project
site: Citia Engineering Indonesia
---

# Banjarbakula

The IPA II Banjarbakula project is part of the development of the Banjarbakula Regional Drinking Water Supply System (SPAM) and raises clean water supply capacity for the Banjarbakula area in South Kalimantan.

| Field | Value |
| --- | --- |
| Year | 2020 |
| Location | Banjarbaru, Kalimantan Selatan |
| Status | Finished |
| Work types | Other |
| Updated | 2026-08-05 |

## About this work

### Overview

The IPA II Banjarbakula project is part of the development of the Banjarbakula Regional Drinking Water Supply System (SPAM). Its aim is to increase the capacity and reliability of clean water supply for the Banjarbakula area, South Kalimantan. The project covers construction and integration of the mechanical, electrical, instrumentation and automation systems that support a safe, efficient and sustainable water treatment process.

The scope of work includes installation of control panels, power distribution, field instrumentation, PLC, SCADA, communication networks, cabling and device configuration. It also includes loop checking, functional testing, Site Acceptance Test (SAT), commissioning, and verification of system performance before handover to the user. All work followed the technical specifications, quality standards and Health, Safety, Security, and Environment (HSSE) requirements.

### Challenges

- Work had to be coordinated across several disciplines (civil, mechanical, electrical and instrumentation), so schedules needed close synchronisation.
- Communication had to be integrated between PLC, SCADA and instrumentation devices from different vendors.
- Instrument parameters had to be adjusted so that the data was accurate and stable.
- Testing had to follow the operational schedule, which limited the time available for commissioning.
- All installations had to meet quality, work safety and technical requirements before the system went into operation.

### Solutions

- The team held regular coordination with all parties to align work schedules and resolve problems in the field.
- A full installation check (pre-commissioning) was done before system testing started.
- Loop checks, I/O tests and functional tests were done in stages to confirm that all signals, interlocks, alarms and system communication work correctly.
- Instruments were reconfigured, calibrated and tuned based on the field test results.
- HSSE procedures were applied consistently through toolbox meetings, Permit to Work (PTW), Job Safety Analysis (JSA), use of personal protective equipment (PPE), and supervision of work during commissioning.

### Lessons learned

- Cross-discipline coordination from the planning stage keeps the project running smoothly and reduces rework.
- Verifying the design, wiring and device configuration before energizing reduces troubleshooting time during commissioning.
- Test results, configuration changes and as-built drawings must be updated regularly so that future maintenance is easier.
- Systematic FAT, SAT and commissioning make the system more reliable and speed up project handover.
- A consistent HSSE culture keeps personnel safe, protects company assets, and lets the project finish without significant incidents.

## Contact

- Company: PT Citia Engineering Indonesia
- Email: services@citiaengineering.com
- Telephone: +62 21 278 20286
- Office: Jl. Kaimun Jaya No. 1, Cilandak Barat, Jakarta Selatan, DKI Jakarta 12430, Indonesia

[Contact Citia](https://citia-engineering.com/en/contact.md)

## Structured data (JSON-LD)

```json
{
  "@context": "https://schema.org",
  "@graph": [
    {
      "@type": "Organization",
      "@id": "https://citia-engineering.com/#organization",
      "name": "Citia Engineering Indonesia",
      "legalName": "PT Citia Engineering Indonesia",
      "alternateName": "Citia",
      "url": "https://citia-engineering.com",
      "logo": {
        "@type": "ImageObject",
        "url": "https://citia-engineering.com/media/citia-logo.png",
        "width": 950,
        "height": 328
      },
      "description": "Citia is an engineering and system integration company in Jakarta. We connect field devices, PLC and SCADA, terminal software and enterprise systems, then install, test and maintain them.",
      "email": "services@citiaengineering.com",
      "telephone": "+62 21 278 20286",
      "address": {
        "@type": "PostalAddress",
        "streetAddress": "Jl. Kaimun Jaya No. 1, Cilandak Barat",
        "addressLocality": "Jakarta Selatan",
        "addressRegion": "DKI Jakarta",
        "postalCode": "12430",
        "addressCountry": "ID"
      },
      "contactPoint": {
        "@type": "ContactPoint",
        "contactType": "customer service",
        "email": "services@citiaengineering.com",
        "telephone": "+62 21 278 20286",
        "url": "https://citia-engineering.com/en/contact"
      },
      "areaServed": {
        "@type": "Country",
        "name": "Indonesia"
      },
      "knowsAbout": [
        "Terminal automation & operations",
        "Tank farm & inventory",
        "Control systems & instrumentation",
        "Reliability & lifecycle",
        "Industrial IoT & monitoring",
        "Installation & site engineering",
        "INTEGRA: Software that runs terminal operations",
        "CATALYST: Devices and gateways that collect field data",
        "Services: Engineering that designs, installs, integrates and maintains both"
      ]
    },
    {
      "@type": "WebSite",
      "@id": "https://citia-engineering.com/#website",
      "url": "https://citia-engineering.com",
      "name": "Citia Engineering Indonesia",
      "inLanguage": [
        "en",
        "id"
      ],
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "potentialAction": [
        {
          "@type": "SearchAction",
          "name": "Search Citia News",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/en/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        },
        {
          "@type": "SearchAction",
          "name": "Cari di News Citia",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/id/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        }
      ]
    },
    {
      "@type": "WebPage",
      "@id": "https://citia-engineering.com/en/projects/banjarbakula#webpage",
      "url": "https://citia-engineering.com/en/projects/banjarbakula",
      "name": "Banjarbakula",
      "description": "The IPA II Banjarbakula project is part of the development of the Banjarbakula Regional Drinking Water Supply System (SPAM) and raises clean water supply…",
      "inLanguage": "en",
      "isPartOf": {
        "@id": "https://citia-engineering.com/#website"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "about": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "breadcrumb": {
        "@id": "https://citia-engineering.com/en/projects/banjarbakula#breadcrumb"
      },
      "dateModified": "2026-08-05",
      "mainEntity": {
        "@id": "https://citia-engineering.com/en/projects/banjarbakula#entity"
      }
    },
    {
      "@type": "BreadcrumbList",
      "@id": "https://citia-engineering.com/en/projects/banjarbakula#breadcrumb",
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "Citia",
          "item": "https://citia-engineering.com/en"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Projects",
          "item": "https://citia-engineering.com/en/projects"
        },
        {
          "@type": "ListItem",
          "position": 3,
          "name": "Banjarbakula",
          "item": "https://citia-engineering.com/en/projects/banjarbakula"
        }
      ]
    },
    {
      "@id": "https://citia-engineering.com/en/projects/banjarbakula#entity",
      "url": "https://citia-engineering.com/en/projects/banjarbakula",
      "mainEntityOfPage": {
        "@id": "https://citia-engineering.com/en/projects/banjarbakula#webpage"
      },
      "@type": "Article",
      "headline": "Banjarbakula",
      "description": "The IPA II Banjarbakula project is part of the development of the Banjarbakula Regional Drinking Water Supply System (SPAM) and raises clean water supply capacity for the Banjarbakula area in South Kalimantan.",
      "dateModified": "2026-08-05",
      "author": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "inLanguage": "en",
      "about": [
        {
          "@type": "Thing",
          "name": "Other"
        }
      ],
      "contentLocation": {
        "@type": "Place",
        "name": "Banjarbaru, Kalimantan Selatan",
        "address": {
          "@type": "PostalAddress",
          "addressLocality": "Banjarbaru",
          "addressRegion": "Kalimantan Selatan",
          "addressCountry": "ID"
        }
      }
    }
  ]
}
```
