---
title: "B50 product update, Padalarang fuel terminal | Citia"
description: "This document reports the reconfiguration and addition of the B50 product to replace the B40 product in the Terminal Automation System (TAS) at Pertamina Fuel…"
url: https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal
language: en
updated: 2026-07-06
type: project
site: Citia Engineering Indonesia
---

# B50 product update, Padalarang fuel terminal

This document reports the reconfiguration and addition of the B50 product to replace the B40 product in the Terminal Automation System (TAS) at Pertamina Fuel Terminal Padalarang.

| Field | Value |
| --- | --- |
| Year | 2026 |
| Status | Finished |
| Work types | Batch Controller |
| Updated | 2026-07-06 |

## About this work

Overview > Implementation of the transition from Biosolar B40 to Biosolar B50. > Work location: Pertamina Fuel Terminal Padalarang. Effective from 1 July 2026. Active materials used: 1. Biofame A040900014 2. Biosolar B50 A040900219 The update focuses on the FD Flow application, to support B50 product transactions. Challenges The product code changes from the B40 scheme to B50. Risk of selecting the wrong product or recording the wrong transaction. The PSO/NPSO material codes are not used yet because they are still pending. The system must only handle the active materials that have been set. Solutions Reconfigured the products in the FD Flow application. Added or updated the material codes: 1. Biofame A040900014 2. Biosolar B50 A040900219 Ran test transactions with the new product codes. Documented the updated application screens and the test results. Lessons learned Active material codes must be validated before a system update. Pending materials must not be configured as operational products. Every product change needs a test run and documentation. System updates must follow the operational scheme in force at the terminal.

## Contact

- Company: PT Citia Engineering Indonesia
- Email: services@citiaengineering.com
- Telephone: +62 21 278 20286
- Office: Jl. Kaimun Jaya No. 1, Cilandak Barat, Jakarta Selatan, DKI Jakarta 12430, Indonesia

[Contact Citia](https://citia-engineering.com/en/contact.md)

## Structured data (JSON-LD)

```json
{
  "@context": "https://schema.org",
  "@graph": [
    {
      "@type": "Organization",
      "@id": "https://citia-engineering.com/#organization",
      "name": "Citia Engineering Indonesia",
      "legalName": "PT Citia Engineering Indonesia",
      "alternateName": "Citia",
      "url": "https://citia-engineering.com",
      "logo": {
        "@type": "ImageObject",
        "url": "https://citia-engineering.com/media/citia-logo.png",
        "width": 950,
        "height": 328
      },
      "description": "Citia is an engineering and system integration company in Jakarta. We connect field devices, PLC and SCADA, terminal software and enterprise systems, then install, test and maintain them.",
      "email": "services@citiaengineering.com",
      "telephone": "+62 21 278 20286",
      "address": {
        "@type": "PostalAddress",
        "streetAddress": "Jl. Kaimun Jaya No. 1, Cilandak Barat",
        "addressLocality": "Jakarta Selatan",
        "addressRegion": "DKI Jakarta",
        "postalCode": "12430",
        "addressCountry": "ID"
      },
      "contactPoint": {
        "@type": "ContactPoint",
        "contactType": "customer service",
        "email": "services@citiaengineering.com",
        "telephone": "+62 21 278 20286",
        "url": "https://citia-engineering.com/en/contact"
      },
      "areaServed": {
        "@type": "Country",
        "name": "Indonesia"
      },
      "knowsAbout": [
        "Terminal automation & operations",
        "Tank farm & inventory",
        "Control systems & instrumentation",
        "Reliability & lifecycle",
        "Industrial IoT & monitoring",
        "Installation & site engineering",
        "INTEGRA: Software that runs terminal operations",
        "CATALYST: Devices and gateways that collect field data",
        "Services: Engineering that designs, installs, integrates and maintains both"
      ]
    },
    {
      "@type": "WebSite",
      "@id": "https://citia-engineering.com/#website",
      "url": "https://citia-engineering.com",
      "name": "Citia Engineering Indonesia",
      "inLanguage": [
        "en",
        "id"
      ],
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "potentialAction": [
        {
          "@type": "SearchAction",
          "name": "Search Citia News",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/en/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        },
        {
          "@type": "SearchAction",
          "name": "Cari di News Citia",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/id/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        }
      ]
    },
    {
      "@type": "WebPage",
      "@id": "https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal#webpage",
      "url": "https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal",
      "name": "B50 product update, Padalarang fuel terminal",
      "description": "This document reports the reconfiguration and addition of the B50 product to replace the B40 product in the Terminal Automation System (TAS) at Pertamina Fuel…",
      "inLanguage": "en",
      "isPartOf": {
        "@id": "https://citia-engineering.com/#website"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "about": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "breadcrumb": {
        "@id": "https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal#breadcrumb"
      },
      "dateModified": "2026-07-06",
      "mainEntity": {
        "@id": "https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal#entity"
      }
    },
    {
      "@type": "BreadcrumbList",
      "@id": "https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal#breadcrumb",
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "Citia",
          "item": "https://citia-engineering.com/en"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Projects",
          "item": "https://citia-engineering.com/en/projects"
        },
        {
          "@type": "ListItem",
          "position": 3,
          "name": "B50 product update, Padalarang fuel terminal",
          "item": "https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal"
        }
      ]
    },
    {
      "@id": "https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal#entity",
      "url": "https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal",
      "mainEntityOfPage": {
        "@id": "https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal#webpage"
      },
      "@type": "Article",
      "headline": "B50 product update, Padalarang fuel terminal",
      "description": "This document reports the reconfiguration and addition of the B50 product to replace the B40 product in the Terminal Automation System (TAS) at Pertamina Fuel Terminal Padalarang.",
      "dateModified": "2026-07-06",
      "author": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "inLanguage": "en",
      "about": [
        {
          "@type": "Thing",
          "name": "Batch Controller"
        }
      ]
    }
  ]
}
```
