---
title: "Automation Project History Indonesia 2020 to 2026 | Citia"
description: "Every project Citia has recorded since 2020, filterable by year, status and city, with project stories and a map of work sites across Indonesia."
url: https://citia-engineering.com/en/projects
language: en
updated: 2026-10-15
type: index
site: Citia Engineering Indonesia
---

# Citia project history

Every project Citia has recorded since 2020, filterable by year, status and city, with project stories and a map of work sites across Indonesia.

| Field | Value |
| --- | --- |
| Project records | 201 |
| Years covered | 2020 to 2026 |
| Ongoing | 8 |
| Cities recorded | 25 |
| With a story page | 52 |

## Projects with a story page

| Project | Year | Location | Status |
| --- | --- | --- | --- |
| [PGE Kamojang: casing reconstruction and added control valve](https://citia-engineering.com/en/projects/pge-kamojang-casing-reconstruction-and-added-control-valve.md) | 2026 | Garut, Jawa Barat | Ongoing |
| [Supply of Allen-Bradley PLC digital output modules and Moxa converter](https://citia-engineering.com/en/projects/supply-of-allen-bradley-plc-digital-output-modules-and-moxa-converter.md) | 2026 | Karawang, Jawa Barat | Ongoing |
| [Motor-operated valve (MOV) communication](https://citia-engineering.com/en/projects/motor-operated-valve-mov-communication.md) | 2026 |  | Ongoing |
| [Pertamina Jambi Terminal: integration of meters 5 and 6](https://citia-engineering.com/en/projects/pertamina-jambi-terminal-integration-of-meters-5-and-6.md) | 2026 | Jambi | Finished |
| [Fuel Terminal Jambi distribution workflow](https://citia-engineering.com/en/projects/jambi-terminal-automation.md) | 2026 | Jambi | Finished |
| [Padalarang TAS lifecycle support](https://citia-engineering.com/en/projects/padalarang-tas-lifecycle.md) | 2026 | Bandung Barat, Jawa Barat | Ongoing |
| [Pressmon prototype for Balongan](https://citia-engineering.com/en/projects/pressmon-prototype-for-balongan.md) | 2026 | Indramayu, Jawa Barat | Finished |
| [Putranata: termination services at LOC-III, RU IV Cilacap](https://citia-engineering.com/en/projects/putranata-termination-services-at-loc-iii-ru-iv-cilacap.md) | 2026 | Cilacap, Jawa Tengah | Finished |
| [Redeco: marine lantern beacon](https://citia-engineering.com/en/projects/redeco-marine-lantern-beacon.md) | 2026 | Cilegon, Banten | Finished |
| [Grounding system assessment, LPG Balongan](https://citia-engineering.com/en/projects/grounding-system-assessment-lpg-balongan.md) | 2026 | Indramayu, Jawa Barat | Finished |
| [B50 product update, Padalarang fuel terminal](https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal.md) | 2026 |  | Finished |
| [Jambi fuel terminal: replacement of ATG gateway (ECU) spare part](https://citia-engineering.com/en/projects/jambi-fuel-terminal-replacement-of-atg-gateway-ecu-spare-part.md) | 2026 | Jambi | Ongoing |
| [Balongan PressMon communication restoration](https://citia-engineering.com/en/projects/balongan-pressure-network.md) | 2025 | Indramayu, Jawa Barat | Finished |
| [Cikampek tank-monitoring upgrade](https://citia-engineering.com/en/projects/cikampek-tank-monitoring.md) | 2025 | Jawa Barat | Finished |
| [Pertamina Bitung integrated terminal: pump PLC restoration](https://citia-engineering.com/en/projects/pertamina-bitung-integrated-terminal-pump-plc-restoration.md) | 2025 | Bitung, Sulawesi Utara | Finished |
| [Pertamina ITJ LPG Priok: transmitter replacement in areas PMB III and IV](https://citia-engineering.com/en/projects/pertamina-itj-lpg-priok-transmitter-replacement-in-areas-pmb-iii-and-iv.md) | 2025 | Jakarta Utara, DKI Jakarta | Finished |
| [Pertamina Priok: unloading and backloading system restoration](https://citia-engineering.com/en/projects/pertamina-priok-unloading-and-backloading-system-restoration.md) | 2025 | Jakarta Utara, DKI Jakarta | Finished |
| [Pertamina Pulau Baai: pump emergency shutdown (ESD)](https://citia-engineering.com/en/projects/pertamina-pulau-baai-pump-emergency-shutdown-esd.md) | 2025 | Bengkulu | Finished |
| [Pertamina Pulau Baai: Smart Seal development](https://citia-engineering.com/en/projects/pertamina-pulau-baai-smart-seal-development.md) | 2025 | Bengkulu | Finished |
| [Pertamina Pulau Layang: aviation fuel metering integration](https://citia-engineering.com/en/projects/pertamina-pulau-layang-aviation-fuel-metering-integration.md) | 2025 | Palembang, Sumatera Selatan | Finished |
| [Pulau Layang distribution automation](https://citia-engineering.com/en/projects/pulau-layang-terminal.md) | 2025 | Palembang, Sumatera Selatan | Ongoing |
| [Redeco: ATG power supply module service](https://citia-engineering.com/en/projects/redeco-atg-power-supply-module-service.md) | 2025 | Cilegon, Banten | Finished |
| [UPS installation for PLC panels at Donggala depot](https://citia-engineering.com/en/projects/ups-installation-for-plc-panels-at-donggala-depot.md) | 2025 | Donggala, Sulawesi Tengah | Finished |
| [Eltech: HMI IP integration](https://citia-engineering.com/en/projects/eltech-hmi-ip-integration.md) | 2024 | Bekasi, Jawa Barat | Finished |
| [Fire alarm system installation at Al Ihsan regional hospital](https://citia-engineering.com/en/projects/fire-alarm-system-installation-at-al-ihsan-regional-hospital.md) | 2024 | Bandung, Jawa Barat | Finished |
| [HPM and Rolls-Royce: data center generator sets JKT02 and JKT05](https://citia-engineering.com/en/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05.md) | 2024 | Jakarta, Jawa Barat | Finished |
| [Indosat and Pertamina: docking for 79 SMART MT units](https://citia-engineering.com/en/projects/indosat-and-pertamina-docking-for-79-smart-mt-units.md) | 2024 | Bandung, Jawa Barat | Finished |
| [Level alarm at Pertamina Lubuk Linggau (Aroja)](https://citia-engineering.com/en/projects/level-alarm-at-pertamina-lubuk-linggau-aroja.md) | 2024 | Lubuklinggau, Sumatera Selatan | Finished |
| [Putranata: terminations in three turnaround areas, RU IV Cilacap](https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap.md) | 2024 | Cilacap, Jawa Tengah | Finished |
| [Redeco ATG fault investigation](https://citia-engineering.com/en/projects/redeco-atg-assessment.md) | 2024 |  | Finished |
| [ABB PLC troubleshooting](https://citia-engineering.com/en/projects/abb-plc-troubleshooting.md) | 2023 | Bandung, Jawa Barat | Finished |
| [Balongan EWTP controls & instrumentation](https://citia-engineering.com/en/projects/balongan-ewtp.md) | 2023 | Jawa Barat | Finished |
| [Cirebon Power AQMS](https://citia-engineering.com/en/projects/cirebon-power-aqms.md) | 2023 | Cirebon, Jawa Barat | Finished |
| [KF flowmeter](https://citia-engineering.com/en/projects/kf-flowmeter.md) | 2023 | Bandung, Jawa Barat | Finished |
| [MPS: Hasakona](https://citia-engineering.com/en/projects/mps-hasakona.md) | 2023 | Balikpapan, Kalimantan Timur | Finished |
| [Telkomsel: OEE for Shei Tai](https://citia-engineering.com/en/projects/telkomsel-oee-for-shei-tai.md) | 2023 | Bandung, Jawa Barat | Finished |
| [Adaro: water level monitoring system](https://citia-engineering.com/en/projects/adaro-water-level-monitoring-system.md) | 2022 | Barito Selatan, Kalimantan Tengah | Finished |
| [LTSA for LPG Panjang](https://citia-engineering.com/en/projects/ltsa-for-lpg-panjang.md) | 2022 |  | Finished |
| [Rich machine connectivity & OEE](https://citia-engineering.com/en/projects/rich-machine-connectivity.md) | 2022 | Serang, Banten | Finished |
| [VSD system optimization](https://citia-engineering.com/en/projects/vsd-system-optimization.md) | 2022 |  | Finished |
| [ABB IKDC phase 3](https://citia-engineering.com/en/projects/abb-ikdc-phase-3.md) | 2021 | Bogor, Jawa Barat | Finished |
| [ABB Amazon 61](https://citia-engineering.com/en/projects/abb-amazon-61.md) | 2020 | Bogor, Jawa Barat | Finished |
| [ABB Amazon 62](https://citia-engineering.com/en/projects/abb-amazon-62.md) | 2020 | Bogor, Jawa Barat | Finished |
| [ABB Keppel](https://citia-engineering.com/en/projects/abb-keppel.md) | 2020 | Bogor, Jawa Barat | Finished |
| [ABB DCS programming at Lomanis fuel terminal](https://citia-engineering.com/en/projects/abb-dcs-programming-at-lomanis-fuel-terminal.md) | 2020 | Lomanis, Jawa Tengah | Finished |
| [ABB: IndoKeppel data center supervision and termination](https://citia-engineering.com/en/projects/abb-indokeppel-data-center-supervision-and-termination.md) | 2020 | Bogor, Jawa Barat | Finished |
| [Banjarbakula](https://citia-engineering.com/en/projects/banjarbakula.md) | 2020 | Banjarbaru, Kalimantan Selatan | Finished |
| [IP Saguling: PDM reconditioning](https://citia-engineering.com/en/projects/ip-saguling-pdm-reconditioning.md) | 2020 | Purwakarta, Jawa Barat | Finished |
| [Petrokimia Gresik: ABB PLC repair](https://citia-engineering.com/en/projects/petrokimia-gresik-abb-plc-repair.md) | 2020 |  | Finished |
| [SCADA chiller troubleshooting at Mayora](https://citia-engineering.com/en/projects/scada-chiller-troubleshooting-at-mayora.md) | 2020 | Cianjur, Jawa Barat | Finished |
| [Cirebon Power: annual AQMS maintenance](https://citia-engineering.com/en/projects/cirebon-power-annual-aqms-maintenance.md) |  | Cirebon, Jawa Barat | Finished |
| [PAGA module reconditioning](https://citia-engineering.com/en/projects/paga-module-reconditioning.md) |  | Bandung, Jawa Barat | Finished |

## Contact

- Company: PT Citia Engineering Indonesia
- Email: services@citiaengineering.com
- Telephone: +62 21 278 20286
- Office: Jl. Kaimun Jaya No. 1, Cilandak Barat, Jakarta Selatan, DKI Jakarta 12430, Indonesia

[Contact Citia](https://citia-engineering.com/en/contact.md)

## Structured data (JSON-LD)

```json
{
  "@context": "https://schema.org",
  "@graph": [
    {
      "@type": "Organization",
      "@id": "https://citia-engineering.com/#organization",
      "name": "Citia Engineering Indonesia",
      "legalName": "PT Citia Engineering Indonesia",
      "alternateName": "Citia",
      "url": "https://citia-engineering.com",
      "logo": {
        "@type": "ImageObject",
        "url": "https://citia-engineering.com/media/citia-logo.png",
        "width": 950,
        "height": 328
      },
      "description": "Citia is an engineering and system integration company in Jakarta. We connect field devices, PLC and SCADA, terminal software and enterprise systems, then install, test and maintain them.",
      "email": "services@citiaengineering.com",
      "telephone": "+62 21 278 20286",
      "address": {
        "@type": "PostalAddress",
        "streetAddress": "Jl. Kaimun Jaya No. 1, Cilandak Barat",
        "addressLocality": "Jakarta Selatan",
        "addressRegion": "DKI Jakarta",
        "postalCode": "12430",
        "addressCountry": "ID"
      },
      "contactPoint": {
        "@type": "ContactPoint",
        "contactType": "customer service",
        "email": "services@citiaengineering.com",
        "telephone": "+62 21 278 20286",
        "url": "https://citia-engineering.com/en/contact"
      },
      "areaServed": {
        "@type": "Country",
        "name": "Indonesia"
      },
      "knowsAbout": [
        "Terminal automation & operations",
        "Tank farm & inventory",
        "Control systems & instrumentation",
        "Reliability & lifecycle",
        "Industrial IoT & monitoring",
        "Installation & site engineering",
        "INTEGRA: Software that runs terminal operations",
        "CATALYST: Devices and gateways that collect field data",
        "Services: Engineering that designs, installs, integrates and maintains both"
      ]
    },
    {
      "@type": "WebSite",
      "@id": "https://citia-engineering.com/#website",
      "url": "https://citia-engineering.com",
      "name": "Citia Engineering Indonesia",
      "inLanguage": [
        "en",
        "id"
      ],
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "potentialAction": [
        {
          "@type": "SearchAction",
          "name": "Search Citia News",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/en/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        },
        {
          "@type": "SearchAction",
          "name": "Cari di News Citia",
          "target": {
            "@type": "EntryPoint",
            "urlTemplate": "https://citia-engineering.com/id/news?q={search_term_string}"
          },
          "query-input": "required name=search_term_string"
        }
      ]
    },
    {
      "@type": "CollectionPage",
      "@id": "https://citia-engineering.com/en/projects#webpage",
      "url": "https://citia-engineering.com/en/projects",
      "name": "Automation Project History Indonesia 2020 to 2026",
      "description": "Every project Citia has recorded since 2020, filterable by year, status and city, with project stories and a map of work sites across Indonesia.",
      "inLanguage": "en",
      "isPartOf": {
        "@id": "https://citia-engineering.com/#website"
      },
      "publisher": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "about": {
        "@id": "https://citia-engineering.com/#organization"
      },
      "breadcrumb": {
        "@id": "https://citia-engineering.com/en/projects#breadcrumb"
      },
      "dateModified": "2026-10-15",
      "mainEntity": {
        "@id": "https://citia-engineering.com/en/projects#list"
      }
    },
    {
      "@type": "BreadcrumbList",
      "@id": "https://citia-engineering.com/en/projects#breadcrumb",
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "Citia",
          "item": "https://citia-engineering.com/en"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Projects",
          "item": "https://citia-engineering.com/en/projects"
        }
      ]
    },
    {
      "@id": "https://citia-engineering.com/en/projects#list",
      "@type": "ItemList",
      "numberOfItems": 52,
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "PGE Kamojang: casing reconstruction and added control valve",
          "url": "https://citia-engineering.com/en/projects/pge-kamojang-casing-reconstruction-and-added-control-valve"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Supply of Allen-Bradley PLC digital output modules and Moxa converter",
          "url": "https://citia-engineering.com/en/projects/supply-of-allen-bradley-plc-digital-output-modules-and-moxa-converter"
        },
        {
          "@type": "ListItem",
          "position": 3,
          "name": "Motor-operated valve (MOV) communication",
          "url": "https://citia-engineering.com/en/projects/motor-operated-valve-mov-communication"
        },
        {
          "@type": "ListItem",
          "position": 4,
          "name": "Pertamina Jambi Terminal: integration of meters 5 and 6",
          "url": "https://citia-engineering.com/en/projects/pertamina-jambi-terminal-integration-of-meters-5-and-6"
        },
        {
          "@type": "ListItem",
          "position": 5,
          "name": "Fuel Terminal Jambi distribution workflow",
          "url": "https://citia-engineering.com/en/projects/jambi-terminal-automation"
        },
        {
          "@type": "ListItem",
          "position": 6,
          "name": "Padalarang TAS lifecycle support",
          "url": "https://citia-engineering.com/en/projects/padalarang-tas-lifecycle"
        },
        {
          "@type": "ListItem",
          "position": 7,
          "name": "Pressmon prototype for Balongan",
          "url": "https://citia-engineering.com/en/projects/pressmon-prototype-for-balongan"
        },
        {
          "@type": "ListItem",
          "position": 8,
          "name": "Putranata: termination services at LOC-III, RU IV Cilacap",
          "url": "https://citia-engineering.com/en/projects/putranata-termination-services-at-loc-iii-ru-iv-cilacap"
        },
        {
          "@type": "ListItem",
          "position": 9,
          "name": "Redeco: marine lantern beacon",
          "url": "https://citia-engineering.com/en/projects/redeco-marine-lantern-beacon"
        },
        {
          "@type": "ListItem",
          "position": 10,
          "name": "Grounding system assessment, LPG Balongan",
          "url": "https://citia-engineering.com/en/projects/grounding-system-assessment-lpg-balongan"
        },
        {
          "@type": "ListItem",
          "position": 11,
          "name": "B50 product update, Padalarang fuel terminal",
          "url": "https://citia-engineering.com/en/projects/b50-product-update-padalarang-fuel-terminal"
        },
        {
          "@type": "ListItem",
          "position": 12,
          "name": "Jambi fuel terminal: replacement of ATG gateway (ECU) spare part",
          "url": "https://citia-engineering.com/en/projects/jambi-fuel-terminal-replacement-of-atg-gateway-ecu-spare-part"
        },
        {
          "@type": "ListItem",
          "position": 13,
          "name": "Balongan PressMon communication restoration",
          "url": "https://citia-engineering.com/en/projects/balongan-pressure-network"
        },
        {
          "@type": "ListItem",
          "position": 14,
          "name": "Cikampek tank-monitoring upgrade",
          "url": "https://citia-engineering.com/en/projects/cikampek-tank-monitoring"
        },
        {
          "@type": "ListItem",
          "position": 15,
          "name": "Pertamina Bitung integrated terminal: pump PLC restoration",
          "url": "https://citia-engineering.com/en/projects/pertamina-bitung-integrated-terminal-pump-plc-restoration"
        },
        {
          "@type": "ListItem",
          "position": 16,
          "name": "Pertamina ITJ LPG Priok: transmitter replacement in areas PMB III and IV",
          "url": "https://citia-engineering.com/en/projects/pertamina-itj-lpg-priok-transmitter-replacement-in-areas-pmb-iii-and-iv"
        },
        {
          "@type": "ListItem",
          "position": 17,
          "name": "Pertamina Priok: unloading and backloading system restoration",
          "url": "https://citia-engineering.com/en/projects/pertamina-priok-unloading-and-backloading-system-restoration"
        },
        {
          "@type": "ListItem",
          "position": 18,
          "name": "Pertamina Pulau Baai: pump emergency shutdown (ESD)",
          "url": "https://citia-engineering.com/en/projects/pertamina-pulau-baai-pump-emergency-shutdown-esd"
        },
        {
          "@type": "ListItem",
          "position": 19,
          "name": "Pertamina Pulau Baai: Smart Seal development",
          "url": "https://citia-engineering.com/en/projects/pertamina-pulau-baai-smart-seal-development"
        },
        {
          "@type": "ListItem",
          "position": 20,
          "name": "Pertamina Pulau Layang: aviation fuel metering integration",
          "url": "https://citia-engineering.com/en/projects/pertamina-pulau-layang-aviation-fuel-metering-integration"
        },
        {
          "@type": "ListItem",
          "position": 21,
          "name": "Pulau Layang distribution automation",
          "url": "https://citia-engineering.com/en/projects/pulau-layang-terminal"
        },
        {
          "@type": "ListItem",
          "position": 22,
          "name": "Redeco: ATG power supply module service",
          "url": "https://citia-engineering.com/en/projects/redeco-atg-power-supply-module-service"
        },
        {
          "@type": "ListItem",
          "position": 23,
          "name": "UPS installation for PLC panels at Donggala depot",
          "url": "https://citia-engineering.com/en/projects/ups-installation-for-plc-panels-at-donggala-depot"
        },
        {
          "@type": "ListItem",
          "position": 24,
          "name": "Eltech: HMI IP integration",
          "url": "https://citia-engineering.com/en/projects/eltech-hmi-ip-integration"
        },
        {
          "@type": "ListItem",
          "position": 25,
          "name": "Fire alarm system installation at Al Ihsan regional hospital",
          "url": "https://citia-engineering.com/en/projects/fire-alarm-system-installation-at-al-ihsan-regional-hospital"
        },
        {
          "@type": "ListItem",
          "position": 26,
          "name": "HPM and Rolls-Royce: data center generator sets JKT02 and JKT05",
          "url": "https://citia-engineering.com/en/projects/hpm-and-rolls-royce-data-center-generator-sets-jkt02-and-jkt05"
        },
        {
          "@type": "ListItem",
          "position": 27,
          "name": "Indosat and Pertamina: docking for 79 SMART MT units",
          "url": "https://citia-engineering.com/en/projects/indosat-and-pertamina-docking-for-79-smart-mt-units"
        },
        {
          "@type": "ListItem",
          "position": 28,
          "name": "Level alarm at Pertamina Lubuk Linggau (Aroja)",
          "url": "https://citia-engineering.com/en/projects/level-alarm-at-pertamina-lubuk-linggau-aroja"
        },
        {
          "@type": "ListItem",
          "position": 29,
          "name": "Putranata: terminations in three turnaround areas, RU IV Cilacap",
          "url": "https://citia-engineering.com/en/projects/putranata-terminations-in-three-turnaround-areas-ru-iv-cilacap"
        },
        {
          "@type": "ListItem",
          "position": 30,
          "name": "Redeco ATG fault investigation",
          "url": "https://citia-engineering.com/en/projects/redeco-atg-assessment"
        },
        {
          "@type": "ListItem",
          "position": 31,
          "name": "ABB PLC troubleshooting",
          "url": "https://citia-engineering.com/en/projects/abb-plc-troubleshooting"
        },
        {
          "@type": "ListItem",
          "position": 32,
          "name": "Balongan EWTP controls & instrumentation",
          "url": "https://citia-engineering.com/en/projects/balongan-ewtp"
        },
        {
          "@type": "ListItem",
          "position": 33,
          "name": "Cirebon Power AQMS",
          "url": "https://citia-engineering.com/en/projects/cirebon-power-aqms"
        },
        {
          "@type": "ListItem",
          "position": 34,
          "name": "KF flowmeter",
          "url": "https://citia-engineering.com/en/projects/kf-flowmeter"
        },
        {
          "@type": "ListItem",
          "position": 35,
          "name": "MPS: Hasakona",
          "url": "https://citia-engineering.com/en/projects/mps-hasakona"
        },
        {
          "@type": "ListItem",
          "position": 36,
          "name": "Telkomsel: OEE for Shei Tai",
          "url": "https://citia-engineering.com/en/projects/telkomsel-oee-for-shei-tai"
        },
        {
          "@type": "ListItem",
          "position": 37,
          "name": "Adaro: water level monitoring system",
          "url": "https://citia-engineering.com/en/projects/adaro-water-level-monitoring-system"
        },
        {
          "@type": "ListItem",
          "position": 38,
          "name": "LTSA for LPG Panjang",
          "url": "https://citia-engineering.com/en/projects/ltsa-for-lpg-panjang"
        },
        {
          "@type": "ListItem",
          "position": 39,
          "name": "Rich machine connectivity & OEE",
          "url": "https://citia-engineering.com/en/projects/rich-machine-connectivity"
        },
        {
          "@type": "ListItem",
          "position": 40,
          "name": "VSD system optimization",
          "url": "https://citia-engineering.com/en/projects/vsd-system-optimization"
        },
        {
          "@type": "ListItem",
          "position": 41,
          "name": "ABB IKDC phase 3",
          "url": "https://citia-engineering.com/en/projects/abb-ikdc-phase-3"
        },
        {
          "@type": "ListItem",
          "position": 42,
          "name": "ABB Amazon 61",
          "url": "https://citia-engineering.com/en/projects/abb-amazon-61"
        },
        {
          "@type": "ListItem",
          "position": 43,
          "name": "ABB Amazon 62",
          "url": "https://citia-engineering.com/en/projects/abb-amazon-62"
        },
        {
          "@type": "ListItem",
          "position": 44,
          "name": "ABB Keppel",
          "url": "https://citia-engineering.com/en/projects/abb-keppel"
        },
        {
          "@type": "ListItem",
          "position": 45,
          "name": "ABB DCS programming at Lomanis fuel terminal",
          "url": "https://citia-engineering.com/en/projects/abb-dcs-programming-at-lomanis-fuel-terminal"
        },
        {
          "@type": "ListItem",
          "position": 46,
          "name": "ABB: IndoKeppel data center supervision and termination",
          "url": "https://citia-engineering.com/en/projects/abb-indokeppel-data-center-supervision-and-termination"
        },
        {
          "@type": "ListItem",
          "position": 47,
          "name": "Banjarbakula",
          "url": "https://citia-engineering.com/en/projects/banjarbakula"
        },
        {
          "@type": "ListItem",
          "position": 48,
          "name": "IP Saguling: PDM reconditioning",
          "url": "https://citia-engineering.com/en/projects/ip-saguling-pdm-reconditioning"
        },
        {
          "@type": "ListItem",
          "position": 49,
          "name": "Petrokimia Gresik: ABB PLC repair",
          "url": "https://citia-engineering.com/en/projects/petrokimia-gresik-abb-plc-repair"
        },
        {
          "@type": "ListItem",
          "position": 50,
          "name": "SCADA chiller troubleshooting at Mayora",
          "url": "https://citia-engineering.com/en/projects/scada-chiller-troubleshooting-at-mayora"
        },
        {
          "@type": "ListItem",
          "position": 51,
          "name": "Cirebon Power: annual AQMS maintenance",
          "url": "https://citia-engineering.com/en/projects/cirebon-power-annual-aqms-maintenance"
        },
        {
          "@type": "ListItem",
          "position": 52,
          "name": "PAGA module reconditioning",
          "url": "https://citia-engineering.com/en/projects/paga-module-reconditioning"
        }
      ]
    }
  ]
}
```
